Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

Replacement of Natural Gas Water Heaters
Renovation
Sub-Bidding
$200,000 CJ est. value
Eau Claire, WI 54701

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

MEPF Design Assist for East, West and Capital High Schools
Alteration
Post-Bid
Madison, WI 53704

Jail Cooling Tower Replacement
Results
Portage, WI 53901

Administration Building Heat Pump Replacement Phase 3
Results
Kenosha, WI 53140

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Remodeling of the Forest County Courthouse
Alteration
Post-Bid
Crandon, WI 54520

Replacing the HVAC Pneumatic Compressor
Results
Darlington, WI 53530

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Clinton Rose Senior Center Second Boiler Install and Exhaust Fans Replacement and Mcgovern Senior Center Exhaust Fans Replacement
Results
Milwaukee, WI 53212

NWHC Replacement of Air Handling Unit - FS-06
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Madison, WI

Insulation Replacement for SMF Building, HVAC Ductwork
Results
Manitowoc, WI

Isolation Rooms
Demolition, Alteration
Post-Bid
Oneida, WI

Replacement of Air-Cooled Chiller and Pump- Rogers Street Academy
Results
Milwaukee, WI 53204

Last Updated 11/14/2022 01:06 PM
Project Title

Levis Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Black River Falls, WI 54615   (Jackson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $79,550 [brand] Estimate
Plans Available from MEP Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: Installation of a domestic hot water storage tank, plate and frame heat exchanger, piping and materials, and associated controls in the Levis Building. NOTICE: All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents