Similar Projects
Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

The Hoffmann Hotel
New Construction, Infrastructure - 77,000 SF
Design
$30,500,000 est. value
Carbondale, CO 81623

The Hoffmann Hotel
New Construction, Infrastructure - 77,000 SF
Design
$30,500,000 est. value
Carbondale, CO 81623

Dog Park at Buckhorn Valley
Infrastructure
Bidding
$180,000 CJ est. value
Gypsum, CO 81637

Dog Park at Buckhorn Valley
Infrastructure
Bidding
$180,000 CJ est. value
Gypsum, CO 81637

Pavilion Structure Upland Park Project
Infrastructure
Post-Bid
Eagle, CO

Midland Avenue Streetscape Project
Infrastructure
Post-Bid
Basalt, CO 81621

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

56--Fencing, Tarping and Debris Removal
Demolition
Results

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

Jules Drive and Highway 6 Roundabout or Traffic Light - Town of Gypsum
Infrastructure
Conception
$2,500,000 CJ est. value
Gypsum, CO 81637

Last Updated 02/17/2023 06:07 PM
Project Title

East Park Improvements and North Restrooms, Harry A. Nottingham Park

Physical Address View project details and contacts
City, State (County) Avon, CO 81620   (Eagle County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 17, 2023, bids were rejected.No definite date for the rebid.** Construction of a public restroom building with 41 stalls, a public restroom building with 6 stalls, concession stand, park plaza, seating wall, electrical infrastructure, paving of parking lots, landscaping, lighting and installation of associated utility improvements. Project Valuation: $3,000,000-$5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Buyer's Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % All questions must be received by January 12, 2023, at 5pm Questions are submitted online Yes The Notice of Award will be taken to Town Council on January 24 or February 14, 2023 The construction period is April 2, 2023, to May 30, 2024.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents