Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFP Engineering - Project Development Services Three Bridge Deck Overlays and One Bridge Thin Deck Overlay Projects
Infrastructure
Conception
$6,249,296 CJ est. value
Fort Wayne, IN 46802

Guardrail Attenuators, New or Modernize
Infrastructure
Design
$1,406,600 CJ est. value
Fort Wayne, IN 46802

Small Structure Pipe Lining
Infrastructure
Design
$9,840,729 CJ est. value
New Haven, IN 46774

Wildwood Area WMR
Infrastructure
Bidding
$2,117,354 CJ est. value
Fort Wayne, IN 46806

Wildwood Area WMR
Infrastructure
Bidding
$2,117,354 CJ est. value
Fort Wayne, IN 46806

Grinder Station Maintenance
Term Contract
Sub-Bidding
Fort Wayne, IN 46802

Lakeside Park Tennis and Basketball Courts Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Fort Wayne, IN 46805

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

On-Call Construction Services
Infrastructure
Post-Bid
Fort Wayne, IN

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

Site Improvements at Haley Elementary School
Results
Fort Wayne, IN 46815

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Village Premier Mixed Use Development
New Construction, Infrastructure
Design
$55,000,000 CJ est. value
Fort Wayne, IN 46802

Deep Rock Test Well #2
Infrastructure
Bidding
$300,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 08/10/2022 02:31 AM
Project Title

Ditch Relocation

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46805   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $264,813 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Control No 2100112 Federal/State No 210011200ST2 IVOSB Goal: 3.00 Ditch Relocation Allen County - Along Sr 930, 2.30 Miles West of I-469 (Rp 149+0086 to 150+0012) Contractors desiring to submit electronic bids via Bid Express must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Bid Express bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. Contractor employee drug testing plan: each contractor that submits a proposal bid in the amount of $150,000 or more for highway Improvements described in this notice is required to submit with that bid a written plan for a program to test the contractors employees for drugs. The Plan shall be in compliance with indiana code 4-13-18. The plan must be submitted to the construction letting email inbox or deposited with the Indot prequalification engineer by the time set for receipt of proposal bids A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety 2000 or Surety Wave, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. INDOT - 501 - Ditch Relocation

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents