Project Title | Stearns Tank 1 and 2 Repairs - CP76300021 - City of Simi Valley |
Physical Address | View project details and contacts |
City, State (County) | Simi Valley, CA (Ventura County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected January 2023, Construction Completion Expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $450,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work for a water / sewer project in Simi Valley, California. Conceptual plans call for site work for a water / sewer project. This project would upgrade the piping and mitigate seismic deficiencies for the 426,000 gallon capacity Stearns Tank No. 1 that has been in service since 1960. The Waterworks Facilities Assessment conducted by Carollo Engineers in 2015 recommended revising the site layout, realigning the piping, and/or a combination of each to install a flexible pipe connection with a full range of differential movement. In addition, the Seismic Evaluation of the Waterworks Storage Tank System conducted by Kenney Jenks in 2020 identified that the during a seismic event that the tank would be unstable and needs fo be anchored to a ring wall foundation and to prevent damage to the roof and shell the tank roof needs to be raised by 5 feet to increase freeboard. Based on the age of the tank and the anticipated costs of the recommended seismic improvements, staff recommends to replace the tank rather than to retrofit. The Design is expected to be completed in November 2022 and construction is expected to be completed by June 2023. Project is included in the City of Simi Valley's FY 2022 - 2027 CIP. As of June 22, 2022, information regarding a design team and a general contractor is not available. Design is anticipated to be completed in November 2022 and construction is anticipated to be completed by June 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |