Similar Projects
Streambank Restoration on Crouse Run Along Sample Road, From the Confluence with Pine Creek to Just Downstream of Royalview Drive
Bidding
Allison Park, PA 15101

Seventh Street Sinkhole Repair Project
Bidding
Oakmont, PA 15139

Corrugated Metal Pipe
Post-Bid
Pittsburgh, PA 15123

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Doyle Avenue Landslide Repair
Results
PA

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

Walker Park Stream Restoration
Bidding
Edgeworth, PA

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

War Memorial Culvert Replacement
Results
Sewickley, PA 15143

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Site Drainage Improvements to the Brentwood Middle/High School
Results
Pittsburgh, PA 15227

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Maintenance Facility Retaining Wall Replacement
Results
Oakdale, PA 15071

Last Updated 01/06/2021 12:36 PM
Project Title

Remediation of Center Avenue Landslide

Physical Address View project details and contacts
City, State (County) Pitcairn, PA 15140   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The remediation of the approximate 200-foot long landslide occurring on the low (south-bound lane) side of Center Avenue and encroaching into the south-bound lane of that roadway, entails stabilization and roadway restoration with an engineered repair system having a design-life of 75 years and following the local standard of care for engineering design of such systems. Preliminarily we anticipate the remedial system could include soil nails, rock anchors, shotcrete or high-strength mesh facing, micropiles, geosynthetically confined soil wall (GCS), soldier beam & lagging (SBL) walls. However, any properly engineered system meeting the minimum goals (or better) outlined in the contract documents may be approved at the discretion of Garvin Boward Beitko Engineering, Inc. and the Borough. As a minimum, the design/build contractor (DBC) must reconstruct the shoulder of Center Avenue to a minimum width of approximately 3 feet beyond the original edge of pavement that has been damaged by the landslide. The pavement in the south-bound lane, above the landside and planned landslide remediation shall be replaced as indicated on the contract documents. In addition, any additional pavement that is damaged due to the DBC's construction methodology shall be reconstructed as indicated. The Owner anticipates the stabilization will include a combination of soil nailing and potential micropile/GCS structure. However, other suggested remedial approaches (soldier beam & concrete lagging, etc.) will be considered, albeit with heightened critical review.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents