Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

HVAC Renovations for: City of Austell Threadmill Complex
Renovation
Sub-Bidding
$545,138 CJ est. value
Austell, GA 30106

Gwinnett County E911 Center HVAC Upgrade Project
Renovation
Sub-Bidding
$170,000 CJ est. value
Lawrenceville, GA 30043

Haralson County High School HVAC Renovation
Alteration
Post-Bid
Tallapoosa, GA 30176

Animal Control HVAC System
Alteration
Post-Bid
$50,000 est. value
Warner Robins, GA 31088

Sparks Hall Phase 3 3rd Floor HVAC Upgrades
Alteration
Results
$375,000 est. value
Atlanta, GA 30303

Roof Top Unit Replacement at Monroe County Middle School
Alteration
Results
Forsyth, GA 31029

HVAC Repair and Installation Services
Renovation
Sub-Bidding
$545,138 CJ est. value
Stone Mountain, GA 30083

HVAC Chillers: Preventative Maintenance and Repair
Alteration
Post-Bid
Marietta, GA

HVAC Maintenance and Repair
Alteration
Results
Atlanta, GA

Monroe High School HVAC Upgrades
Renovation
Sub-Bidding
$2,800,000 CJ est. value
Albany, GA 31701

Georgia Gwinnett College Chilled Water Distribution Phase 2C
Alteration
Post-Bid
$60,000 est. value
Lawrenceville, GA 30043

High School Gym HVAC Replacement Units
Alteration
Results
Eastman, GA 31023

Merry Acres Middle School HVAC Upgrades
Renovation
Sub-Bidding
$4,000,000 CJ est. value
Albany, GA 31707

AHU 25 Replacement and AHU 32 Install at the Atlanta Air Route Traffic Control Center (ARTCC)
Alteration
Post-Bid
$250,000 to $500,000 est. value
Hampton, GA 30228

Last Updated 10/11/2023 08:33 AM
Project Title

Beaver Ridge Elementary School- Interior Renovations

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing of all labor, materials, and services necessary for the construction of the HVAC project Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre Construction meeting as soon as all required paper work such as Contracts, Bonds, Insurance, Submittals, etc. are in order. Contractor shall mobilize within ten (10) days of the Notice to Proceed; however, construction must be performed by a completion date of July 19, 2024. Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum will be required of the successful bidder and from successful Mechanical/HVAC, Plumbing, Electrical, Fire Protection, Subcontractors. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.MThe furnishing of all labor, materials, and services necessary for the construction of the HVAC project Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre Construction meeting as soon as all required paper work such as Contracts, Bonds, Insurance, Submittals, etc. are in order. Contractor shall mobilize within ten (10) days of the Notice to Proceed; however, construction must be performed by a completion date of July 19, 2024. Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum will be required of the successful bidder and from successful Mechanical/HVAC, Plumbing, Electrical, Fire Protection, Subcontractors. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.M The Owner reserves the right to accept or reject any or all Bids and to waive technicalities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents