Similar Projects
BHTP Transmission Force Main Section 1 - Subaqueous Portion
New Construction
Bidding
Virginia Beach, VA

Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II(NP013820)
New Construction
Bidding
Suffolk, VA 23435

Preventive Maintenance Program
Post-Bid
Portsmouth, VA

Secondary Clarifier Drive Repair - CETP
Post-Bid
Virginia Beach, VA

Crozet Water Treatment Plant - Expansion and Rehabilitation
Results
$7,170,000 est. value
Charlottesville, VA

Water Pollution Control Facility Aeration System Replacement and Upgrade
Results
Less than $50,000 est. value
Leesburg, VA 20175

Shenandoah Valley Organic Packaging Plant Expansion
New Construction - 132,600 SF
Pending Verification
$10,000,000 CJ est. value
Harrisonburg, VA 22802

Water Reclamation Facility Nutrient Removal Upgrade Phase I
New Construction
Bidding
Richmond, VA 23231

2020 Waterworks Improvements Phase II Project
Post-Bid
Radford, VA

Elysian Wastewater Treatment Facility Blower and Blower Package
Results
Leesburg, VA 20176

On Call Materials and Construction Related Testing Services
Term Contract
Post-Bid
Winchester, VA 22601

Granular Activated Carbon Replacement
Term Contract
Results
Charlottesville, VA 22902

Filter Media and Silica Sand Removal in Equalization Basin
Post-Bid
Norfolk, VA 23502

Observatory and South Rivanna Water Treatment Plants, Rehabilitation and Expansion Project
Results
$32,570,000 est. value
Charlottesville, VA 22902

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Last Updated 09/03/2021 03:36 PM
Project Title

Water Reclamation Facility - Relocate Underground Duct Bank ENR 8 and 9

Physical Address View project details and contacts
City, State (County) Richmond, VA 23231   (Henrico County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the completion of a ground penetrating radar sweep of the proposed conduit support structures route (required prior to commencement of support structure installation) and installation of conduit support structures, conduit, pull boxes and new wiring, as shown and specified in the Contract Documents, to provide a relocated path for control, power, and analog signal wiring currently routed through a failed duct bank located between ENR Basins 8 and 9. Conduit and wiring within the failed duct bank will be abandoned. Additionally, two existing concrete ramps spanning the duct bank will be demolished and rebuilt in place and a third, new ramp, will be constructed. Work shall be accomplished during active operation of ENR basins, NRCY system, and without interruption to treatment facilities. The project is located at 9101 WRVA Road, Henrico, VA 23231.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents