Similar Projects
WWTF General Construction Contract G
New Construction
Bidding
Kiel, WI 53042

Cluster System Expansion
Addition
Bidding
Lake Hallie, WI

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

Chemical Feed System at the Wastewater Treatment Facility
Renovation
Bidding
Angelica, WI

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Operations Building Elevator Modernization
Renovation
Post-Bid
$100,000 est. value
Madison, WI 53713

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

Last Updated 08/26/2021 10:03 AM
Project Title

2021 WWTF Upgrade

Physical Address View project details and contacts
City, State (County) Merrillan, WI   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements at the Hatfield Sanitary District Wastewater Treatment Facility including, but not limited to, prefabricated fiberglass composite building to house new chemical feed equipment; chemical feed equipment; control manhole modifications; wastewater transfer pump; site work; new electrical service; controls; and related electrical work.

Details

Sewage Treatment Plant, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 09 - Finishes, Painting and Coating.
Division 13 - Special Construction.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents