Similar Projects
Design Build - Casework Design and Install
Alteration
Bidding
Largo, FL

PVCH-Framing and Drywall
Alteration
Bidding
$200,000 est. value
Lake Worth, FL 33463

Public Works Administration Building Envelope Improvements
Post-Bid
Less than $300,000 est. value
Orlando, FL 32839

Halifax Health Fountain Building - Smoke/FIre Barrier Door Replacements
Renovation
Post-Bid
Daytona Beach, FL 32114

Interior Wall Reconfigurations at Bellamy and Mcdonald Elementary
Results
Seffner, FL 33584

Restoration of Training Burn Prop
Results
Less than $50,000 est. value
Leesburg, FL 34748

GC West - MAP/Surtax Oversight Board Interior Improvements
Construction
$2,915,317 est. value
Plantation, FL 33324

South Regional Gutters and Downspouts Replacement
Post-Bid
Palm Bay, FL

Accordion Folding Partitions Replacement - FEMA Project
Results
Melbourne, FL 32901

Saints Golf Course Acoustic Ceiling Installation
Post-Bid
Port Saint Lucie, FL

West Hernando Middle School Ceiling and Lighting Upgrades
Results
Less than $264,000 est. value
Brooksville, FL 34614

Suspended Acoustical Ceiling Services
Term Contract
Post-Bid
FL

City Barn Roof and Interior Repairs
Results
Less than $38,774 est. value
Frostproof, FL 33843

Furnish & Install Ceiling Grid, Acoustical Tile & Insulation
Post-Bid
FL

Resource Recovery Facility Tile Wall Modification
Results
Less than $2,519,014 est. value
Tampa, FL 33619

Last Updated 07/13/2022 04:34 PM
Project Title

Repair DMS Facility for An/Asq-236 Radar Pods - Bldg 182

Physical Address View project details and contacts
City, State (County) Homestead, FL   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

NOTE: This is a completion project resulting from a termination for default. The winning contractor will be expected to complete the project IAW the SOW, design requirements and 100% signed and sealed drawings. Upon award, the prevailing contractor as part of its obligation to complete construction shall assume responsibility for the delivery and coordination of specialty manufactured items, equipment and due balances. The prevailing contractor will also be responsible for all pending submittals and re-submitting all disapproved submittals. Further the documents provided with this notice are for reference only. All finalized documents will be available with the solicitation. The contractor design shall incorporate all necessary calculations, demolition, alterations, repairs, new installations, tests and certifications required to perform: The Government will remove all furniture prior to the Contractor beginning work on the project. The Contractor shall remove and later re-install items mounted on the walls that were not previously removed by the Government including, but not limited to, dry erase board, hand sanitizer dispensers, paper towel holders, and toilet paper holders. Removal of such items shall occur prior to paining or wall paper removal and re-installation shall occur after all other required work is completed.

Details

Division 01 - General Requirements, Cleaning and Waste Management.
Division 09 - Finishes, Painting.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents