Similar Projects
RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Perry, GA 31069

Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

City of Metter Fire and Rescue Station
New Construction
Design
Metter, GA

Coastal Pines Technical College Precision Machining & Manufacturing Building
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Kingsland, GA 31548

Urban Pathway Phase 1 Re-bid
Infrastructure
Bidding
$795,361 CJ est. value
Fitzgerald, GA 31750

Striping and Marking Project
Infrastructure
Sub-Bidding
$195,000 CJ est. value
Albany, GA 31701

Runway Electrical Rehabilitation
Infrastructure
Sub-Bidding
$415,000 CJ est. value
Canon, GA 30520

Inspections, Maintenance, Service, Repair and Reports for the Fire Training Tower at Fort Gordon, GA.
Post-Bid
Fort Gordon, GA

Construction of Fire Station No. 7
New Construction - 1,500 SF
Post-Bid
Less than $5,068,409 est. value
Decatur, GA 30030

Fire Station 10 and 14 Renovations
Renovation
Results
Alpharetta, Suwanee, GA 30024

Fire Station 10 Kitchen Remodel
Renovation
Results
Less than $19,950 est. value
Fayetteville, GA 30215

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Design-Build Fire Station No. 8 - Gum Creek Road
New Construction
Construction
Less than $1,600,000 est. value
Covington, GA 30014

RFP Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Pending Verification
$100,000,000 CJ est. value
Social Circle, GA 30025

Last Updated 07/26/2022 04:32 PM
Project Title

Site Work New Police Station

Physical Address View project details and contacts
City, State (County) Emerson, GA 30137   (Bartow County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City of Emerson is seeking bids and qualifications for the Site Work for the new Police Station. The City will let a contract to the most responsible, qualified, proposer All questions regarding bid documents shall be sent to the same email address. No questions will be answered via telephone. The City of Emerson reserves the right to reject any and all bids and to waive any technicalities or irregularities and to award the contract based on the highest and best interests of Emerson.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents