Similar Projects
Mulberry Street Parking Lot
New Construction
Conception
Newark, NJ 07102

Paving, Striping and Repair of a Surface Parking Lot located at Block 711, Lot 7.01 in East Orange for the East Orange Parking Authority
Post-Bid
East Orange, NJ 07018

Agency-Wide Site Work at Various Newark Housing Authority Sites
Term Contract
Post-Bid
Newark, NJ 07102

ADA Improvements at Various Locations
Results
$448,225 est. value
Maplewood, NJ 07040

ADA North Contract 3, Five Sites within Northern
Results
Less than $5,000,000 est. value
Denville, Hillside, Newark, Nutley, Ramsey, Randolph, NJ 07834

Front Walkway Restoration at the Town Hall
Post-Bid
Maplewood, NJ 07040

Pleasant Valley Way Parking Lot Reconstruction Project
Results
West Orange, NJ 07052

Masonry Restoration and Concrete Sidewalk Repair Services
Post-Bid
Newark, NJ 07102

Route 21, Lafayette Street to on Ramp at Interchange 7
Results
$5,000,001 to $10,000,000 est. value
Newark, NJ 07101

Construction of Essex County College Concrete Sidewalk Repair
Post-Bid
Newark, NJ 07102

ST. Mark`s Walkway Improvement
Results
West Orange, NJ 07052

ADA Ramp Improvements at Municipal Intersections
Post-Bid
Cedar Grove, NJ 07009

Harrison Avenue Recreation Complex Improvements
Results
Roseland, NJ 07068

ADA Upgrades to Fire Department Headquarters and Fire Station #2
Post-Bid
Montclair, NJ 07042

Reconstruction of the Irvington Library Parking Lot
Results
Irvington, NJ 07111

Last Updated 08/12/2021 02:38 PM
Project Title

2020 ADA Improvements at Various Locations

Physical Address View project details and contacts
City, State (County) Maplewood, NJ   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the Reconstruction of Existing Curb Ramps, Sidewalks and Incidental Drainage Modifications in Order to Comply with Current Ada Regulations and Guidelines Throughout The Township.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents