Similar Projects
Phosphorus Limit Compliance - Design Work - City of Alabaster
Renovation
Conception
$2,500,000 CJ est. value
Alabaster, AL 35007

Main Plant Generator Replacement - City of Alabaster
Renovation
Conception
$500,000 CJ est. value
Alabaster, AL 35007

Ultraviolet Disinfection Facility Improvements
New Construction, Infrastructure
Design
$720,000 CJ est. value
Birmingham, AL 35233

Mobile Area Water and Sewer Service (MAWSS) Eslava Creek Trunk Upgrades
Infrastructure
Bidding
$300,000 CJ est. value
Mobile, AL 36618

Northport Wtp Chemical System Improvements
Infrastructure
Bidding
$1,300,000 CJ est. value
Northport, AL 35476

WWTP Upgrade and Expansion
Addition
Post-Bid
Phenix City, AL

Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3
Renovation, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Birmingham, AL 35224

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Madison Wastewater Treatment Plant 2021 Improvements
Construction
$10,275,000 est. value
Madison, AL 35756

Water Plant Filter Rehabilitation - City of Auburn
Renovation
Conception
$2,000,000 CJ est. value
Auburn, AL 36830

Sewer Treatment Plant Replacement for Oak Grove Schools
Infrastructure
Bidding
$500,000 CJ est. value
Bessemer, AL 35023

Slab Creek Wastewater Treatment Plant Improvements
Renovation
Post-Bid
Boaz, AL 35957

Western Area Waste Water Treatment Plant (WWTP) Phase I Expansion
Renovation
Results
$600,000 est. value
Huntsville, AL

Aerators - City of Alabaster
Renovation
Conception
$750,000 CJ est. value
Alabaster, AL 35007

Last Updated 07/18/2023 10:00 AM
Project Title

Valley Creek WRF Clarifier Rehabilitation and Crane Modifications

Physical Address View project details and contacts
City, State (County) Bessemer, AL 35023   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $27,315,935 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION This project includes the following elements which are to be performed at the Valley Creek Water Reclamation Facility (WRF): Replacement or coat- ing for select items in the Headworks area, an elevated ramp to facilitate truck loading of screenings, repair of spalled concrete in several clarifiers, structural repairs in several clarifiers, coating of several clarifier mecha- nisms and associated ferrous metal sur- faces, removal and/or replacement of the concrete topping in several clari- fiers, replacement of several existing valves, coating or replacement of sev- eral corroded metal elements, repair of leaking joints in digester area, coating of the cover for Digester No. 2, modi- fications in Pump Room B, a new motor operated valve on the plant water system, replacement of the efflu- ent pump rail system, replacement of two effluent pump VFDs, conveyor replacements in the dewatering area, demolition of some items in the dewa- tering area, modifications to the blower water system, and repair of leaking digester piping. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project. The Contract Time for this project is five hundred forty (540) consecutive calendar days from the effective date of the written Notice to Proceed to achieve Final Acceptance. Liquidated damages will be assessed if this time limit is exceeded. The Contractor may apply for an extension of time in accordance with the provi- sions of the Contract; however, such an extension must be approved prior to the Contract Completion Date to avoid the imposition of liquidated damages. Questions concerning meaning or intent of Bidding Documents shall be submitted to Craig A. Ferguson, PE, BCEE, Brown and Caldwell, at email caferguson@brwncald.com no later than 5:00 p.m. local time on November 29, 2022. All questions must be in writing on Bidder's company's letter- head.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents