Similar Projects
16th & Duquesne Stormwater Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Joplin, MO 64801

Plumbing Service and Repair
Term Contract
Sub-Bidding
Saint Charles, MO 63301

On- Call Plumbing Services
Term Contract
Sub-Bidding
Clay, MO 63501

Plumbing Services for the Philips Park Pavilion
Term Contract
Post-Bid
Columbia, MO 65201

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

At-Risk Construction Management Services
Term Contract
Post-Bid
Blue Springs, MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Testing, Adjusting And Balancing Proposal Package 7
Term Contract
Post-Bid
Saint Louis, MO

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Kiel Garage Drain Repairs
Alteration
Post-Bid
Saint Louis, MO 63103

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

Rotary Twist Drain Assembly
Alteration
Post-Bid
Saint Louis, MO

Last Updated 04/28/2023 02:23 PM
Project Title

Holden Elementary Building Upgrades

Physical Address View project details and contacts
City, State (County) Holden, MO 64040   (Johnson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate - 03/14/23
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following work: New lay in ceilings, new receptacles, and new domestic water piping The Owner reserves the right to reject any and all bids. Bidders must provide a Bid Bond in the amount of 5% of the proposed contract sum. The successful bidder will be required to provide 100% Performance and Payment Bonds, and to comply with the Missouri Department of Labor Standards Prevailing Wage Rates.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents