Similar Projects
Highway and/or Bridge Design and Engineering Services
Design
Less than $80,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Design
Less than $80,000,000 est. value

C1da--Construct Entry Canopies at Building 2, Building 21, Building 42, and The Parking Garage - A/E Design
Bidding
$1,000,000 to $5,000,000 est. value
Salisbury, NC 28144

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Bidding
$10,000 to $300,000,000 est. value

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Consulting Services Hazard Mitigation Grant Program (HMGP)
Post-Bid
Fayetteville, NC

N62470-17-R-4010 Professional Services supporting NAVFAC AOR with a concentration of work in the Continental United States, the Caribbean, Europe, Africa, and South Western Asia
Results
Less than $45,000,000 est. value

USPS A-E IDIQ Services
Results
$10,000 to $9,900,000 est. value

Professional Engineering Services - Pavement Condition Survey
Post-Bid
Salisbury, NC

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

Solid Waste Management Engineering Service
Post-Bid
Fayetteville, NC

Issue 30-Day Solicitation Notice for SF 330's
Results

Indefinite Delivery Indefinite Quantity Contract for Architect-Engineer Services for Range Sustainability Services for Military Training and Testing Range Complexes and Assets at Various Locations Worldwide
Post-Bid
$5,000 to $10,000,000 est. value

2019 Eastern Divisions Planning and Design Engineering and Gesc - Limited Services Contract
Results

Multi-Media Compliance Services with an Emphasis on Fuel Storage Tanks/Spill, Air, and Waste/Materials Services
Post-Bid
$50,000 to $30,000,000 est. value
Washington, DC 20001

Reported 02/05/2021 12:00 AM
Project Title

F103--Annual Service Agreement for Legionella Testing for VISN 6

Physical Address View project details and contacts
City, State (County) Asheville, Fayetteville, Salisbury, NC - Hampton, Richmond, Salem, VA 28805 (Buncombe, Cumberland, Rowan (NC) - Chesterfield, Hampton City, Salem City (VA) Counties)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Provide all the necessary services to provide guidance and monitoring for the seven VISN 6 facilities Water Management Programs (WMP). Contractor shall provide a minimum of 2 face-toface meetings per year for each facility and be available for monthly teleconferences for each facility. The purpose of these meetings is to improve the safety and efficiency of all potable and utility water systems, and ensure each facility’s WMP meets the current requirements of VA Directive 1061 Prevention of Healthcare-Associated Legionella Disease and Scald Injury from Potable Water Distribution Systems. After contract award, and within 90 days of the VHA’s issuance of the new Directive 1061, contractor shall review each facility’s WMP and provide guidance to ensure each WMP meets the new directive’s requirements. This initial review shall be documented in a report to the COR with a copy to the technical manager at each facility within 90 days after award. 2. Provide Legionella testing and the other data as identified in the attached VISN 6 Directive 1061 Water Sampling Requirements and the sample data spreadsheets. Testing shall be accomplished quarterly in the following months each year: May, August, November and February. Facilities shall receive one-week notice prior to taking any samples, POC identified in below table. Facilities shall receive all water testing results directly from the laboratory performing analysis and within 24 hours of release of laboratory reports. Each facility shall receive a full summary report within 17 days of the sample date in excel spreadsheet format. Each spreadsheet shall have 3 tabs, a summary tab, a positive detection tab and a negative detection tab. See attached for how the data shall be reported. No deviations in format to the negative detection tab shall be allowed, since the facility will use this tab to upload the results into the VA’s national water management safety tool.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents