Similar Projects
2021 WWTF Upgrade
Bidding
Merrillan, WI

Digester Cover Rehabilitation Project
Renovation
Bidding
Waupaca, WI

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

CSTP 5 Improvements
Post-Bid
Superior, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Wastewater Treatment Plant Clarifier Rehabilitation Project 2021
Term Contract
Post-Bid
Waupaca, WI 54981

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

WTF Chemical Feed Systems Improvements
Post-Bid
North Freedom, WI 53951

Last Updated 03/12/2021 07:57 AM
Project Title

Wastewater Treatment Facility Chemical Feed System

Physical Address View project details and contacts
City, State (County) Bangor, WI   (La Crosse County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a prefabricated fiberglass composite building, chemical feed system; site work, plumbing, and electrical work.

Details

Sewage Treatment Plant, Renovation.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents