Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

Snow Blowing and Snow Removal Services
Post-Bid
Sault Sainte Marie, MI 49783

Seasonal Snow Removal
Post-Bid
Mount Pleasant, MI

Snow Removal for DEQ 635 Filley Street District Office
Results
Lansing, MI

Waste Disposal and Recycling Services
Results
Less than $60,000 est. value
Wayne, MI

2019-2020 Snow Removal
Post-Bid
Niles, MI

Lawn Mowing/Snow Removal
Results
Less than $1,860 est. value
Port Huron, MI

Snow Removal and Ice Management Services for the 2019/2020 Snow Season for the Romulus Athletic Center.
Term Contract
Post-Bid
MI

Dart Auditorium-Fire Curtain And Rigging Replacement
Results
Pinckney, MI

Snow Removal Services - Multiple Sites
Post-Bid
Detroit, MI

Property Maintenance
Term Contract
Results
Kalamazoo, MI

Bridge Icicle Removal
Term Contract
Post-Bid
MI

Neighborhood Stabilization Program - Right of First Refusal
Results
Garden City, MI

Hillman Fire Department Snow Removal
Post-Bid
Hillman, MI 49746

Aqueous Film Forming Foam (Afff) Collection and Disposal
Results
Lansing, MI

Last Updated 04/09/2020 12:40 PM
Project Title

DNR Grand Haven State Park - Sand Relocation Project

Physical Address View project details and contacts
City, State (County) Grand Haven, MI   (Ottawa County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.Contractor will remove all snow fence in a manner that will prevent damage to the fence and steel posts to preserve it for future use. 2. All fencing material is to be rolled in tight rolls not to exceed 50’ in length. 3. All zip ties used to secure fence are to be cut from the fence and placed in trash receptacles. 4. Fence posts must be removed in such a manner to prevent bending and distorting. 5. Fence and posts are to be stacked at the park headquarters as directed by the Park Supervisor or their designated appointee. 6. Contractor must report to the supervisor any damage to state property and then repair/replace at cost to the contractor through approved vendors.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents