Similar Projects
2022 HVAC Upgrades Project for Rogers Elementary
Alteration
Bidding
Mehlville, MO 63129

Contractual Specialized Landscaping Services
Alteration
Bidding
Clayton, MO

HVAC and Mechanical Products
Term Contract
Post-Bid

Residential Solid Waste Collection of Trash, Recyclables and Yard Waste
Term Contract
Post-Bid
Hazelwood, MO

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Led Light Pole Fixtures
Results
Ballwin, MO

2022 Street Trees
Term Contract
Bidding
Maryland Heights, MO

Hubbell LED Troffers Lighting
Post-Bid
Saint Louis, MO

Cooling Tower and Closed Systems Water Treatment
Alteration
Results
MO

FY22 Residential Tree Planting
Term Contract
Bidding
Clayton, MO

Curbside Leaf Collection FY22-FY29
Post-Bid
Olivette, MO

Grand Glaize WWTF Transformer and Gate Replacement
Alteration
Results
Saint Louis, MO

FY22 Street Tree Removal Services
Term Contract
Bidding
Clayton, MO

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Caulks Creek Pump Station B (P-751) Generator Installation (IR)
Alteration
Results
$174,000 est. value
Chesterfield, MO 63017

Reported 11/02/2021 05:58 AM
Project Title

Facilities Maintenance Services

Physical Address View project details and contacts
City, State (County) Saint Louis, MO   (Saint Louis County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Hauling, HVAC, Landscaping/Irrigation, Plumbing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

These maintenance services will cover the following: Grounds maintenance, snow removal, beautification, and landscaping projects at all KIPP St. Louis Facilities (6 buildings). Preventative maintenance services for heating, ventilation, and air conditioning systems. (4 buildings) General maintenance services for plumbing, electrical, HVAC, and carpentry areas. (6 buildings).

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents