Similar Projects
CPS Sor Juana Old John Hancock College Prep
Renovation
Post-Bid
$750,000 CJ est. value
Chicago, IL 60629

Rhodes School District 84.5 Classroom Addition and Renovation
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$1,408,300 CJ est. value
River Grove, IL 60171

Interior Remodeling at the Crystal Lake Park District Nature Center
Renovation
Results
$200,000 est. value
Crystal Lake, IL 60014

Lead (Based Paint) Hazard Reduction Program (LHRP)
Alteration
Results
East Moline, Moline, IL 61244

Village Hall Interior Finishes Improvements
Renovation
Post-Bid
$682,000 CJ est. value
Fox River Grove, IL 60021

Burley-Chase-ACD-03-22-2022-Only Pre-Qualified Various Trades Pool
Renovation
Results
$307,200 CJ est. value
Chicago, IL 60604

Ceiling and Lighting Replacement Project
Alteration
Post-Bid
$260,000 est. value
Lyons, IL 60534

Barnard Elementary School and Percy Julian High School
Renovation
Results
$12,944,000 CJ est. value
Chicago, IL 60604

Installation of ADA Compliant Buttons/Operators and Bathroom Fixtures
Alteration
Post-Bid
$700,000 est. value
Oglesby, IL 61348

2022 Acoustical Improvements
Alteration
Results
Flossmoor, IL 60422

Weatherization Services- Architectural
Alteration
Post-Bid
Rockford, IL

Northeast & Southeast 2022 Interior Finish Upgrades
Alteration
Results
Evergreen Park, IL 60805

Farmhouse Sink
Alteration
Post-Bid
Geneva, IL 60134

Acoustical Panels
Alteration
Results
Rockford, IL 61102

Glenbrook South Interior Renovations
Alteration
Post-Bid
$213,000 est. value
Glenview, IL 60026

Last Updated 10/06/2023 03:12 AM
Project Title

Furnish, Deliver and Install New Physical Education Lockers at Willowbrook High Schoo

Physical Address View project details and contacts
City, State (County) Villa Park, IL 60181   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $205,197 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Willowbrook High School is looking to replace the physical education (gym) lockers in their female locker room. Doors are to be made from heavy 14 gauge steel. Sides, tops, bottoms, and shelves to be made from 16 gauge steel. Doors and sides are to be perforated with a diamond-shaped pattern to allow for air circulation while maintaining security. We are looking to replicate the design of the existing locker room lockers in reference to the type of tiered style that already exists. If you have any questions regarding this bid, please contact me at 630-530-3971 or via e mail at odavis@dupage88.net. Proposals shall be submitted on forms to be provided by the Board of Education and completed in full. The sealed envelope containing your bid should be plainly marked: "SEALED BID - Physical Education Lockers". The Board of Education reserves the right to reject any or all bids, to waive minor informalities in any bid, or to make award in the best interest of DuPage High School District 88. The Board of Education reserves its rights to reject any goods and to cancel all or any part of this sale if the Seller fails to deliver all or any part of the goods described in the invitation to bid in accordance with the terms, conditions, and specifications contained herein. Acceptance of any part of the goods covered by the invitation to bid shall not obligate the Board of Education to accept future shipments nor deprive it of its rights to revoke any acceptance theretofore given

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents