Similar Projects
Klamath, Lake and Deschutes County Curb Ramps Project
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Klamath, Lake and Deschutes County Curb Ramps Project
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

Susan Campbell Sidewalk Improvement Project
Infrastructure
Post-Bid
Eugene, OR 97403

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Parking Lot Asphalt at SRCI
Infrastructure
Results
Ontario, OR 97914

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

R4 Headquarters Empire Avenue Driveway Landing
Infrastructure
Results
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

ADA Ramps South West Farmington Road Multiple Locations
Infrastructure
Results
$750,000 to $1,500,000 est. value
Beaverton, OR 97003

I-5 /OR99/OR238/US199/OR62/OR140 - Curb Ramps Project Various Highways
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

Last Updated 12/17/2021 01:43 AM
Project Title

US395: Sidewalk Improvements (John Day) Project

Physical Address View project details and contacts
City, State (County) OR   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 300 ft2 temp sign; 1,300 hr flag; 100 ft ped channel device; temp water manage (95 ft pipe, 10 yd2 plastic sheet; 40 ea sandbag); 20 ea inlet protect; 85 ft sed barr; 127 ft rem asbestos; const surv wrk; 440 ft rem pipe; 610 yd2 rem surface; 1,600 ft asph saw cut; 44 yd3 ditch exc; 53 yd2 riprap geotext; 25 yd3 riprap; 1,300 ft video insp; 1,056 ft pipe; 16 ea conc inlet; 6 ea adjust manhole; 613 yd2 trench resurf; 700 yd2 pvmt rem; 1,700 ton aggr base; 91 ton CACP; 540 ton ACP; 13 ea asph appr; 7,300 ft2 asph slope paving; 1,870 ft curb; 6,600 ft2 conc drive; 9,400 ft2 conc walk; 7 ea curb ramp; 88 ft2 trunc dome; 8 ea curb opening with spillway; 7,700 ft high performance pvmt marking; 470 lb PSST; 67 ft2 sign; flasing beacon install; infiltration pond (270 yd3 exc; 8 yd3 riprap; 60 yd3 water quality mix); water quality swale (125 yd3 water quality mix); 160 yd2 seeding; 110 ft fence; 51 ft handrail; water quality planter (36 yd3 exc; 11 yd3 water quality mix; 1,365 lb reinforcement; 14 yd3 struc conc); 79 ton durable round rock; 792 ft potable water pipe

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents