Project Title | Thermo-Removal and Replace |
Physical Address | View project details and contacts |
City, State (County) | Milton, FL 32570 (Santa Rosa County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $372,564 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Santa Rosa Road Name: Milton Ops Maintenance - Thermo Remove and Replace Limits: Midpoint Project(s): 42214237210(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 60 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 days The improvements under this Site-Specific, Lump Sum contract consist of removal and replacement of all thermoplastic pavement markings and reflective pavement markers on State Road 8 (Interstate 10) in Santa Rosa County, at location shown in the Appendices. All work will be performed at night and a Traffic Control Officer will be required for all Work Zones. Maintenance of Traffic, Mobilization and Traffic Control Officers are incidental to pay item. A Contractor Experience Form (850-070-06), Experience in Pavement Markings, is required to be submitted with bid For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order : 006 Thermo-Removal and Replace |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |