Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Bidding
$2,500,000 est. value

Mountainview Road Extension and SWM Project
Alteration
Post-Bid
Boonsboro, MD 21713

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Improvements to Wesel Boulevard
Results
Hagerstown, MD 21740

Dam Access Road Repairs at the Greenbrier State Park
Results
$500,000 to $1,000,000 est. value
Boonsboro, MD 21713

Asphalt Installation and Repair
Term Contract
Results
Hagerstown, MD 21740

Mill, Patch and Resurface Roadway Pavements at Various Locations
Results
$2,500,000 to $5,000,000 est. value
MD

Mill, Patch and Resurface Roadway Pavements at Various Locations In Washington County (East)
Results
$2,500,000 to $5,000,000 est. value
MD

Pavement Maintenance and Rehabilitation Program FY-21, Hot Mix Asphalt (HMA) Applications
Results
Hagerstown, MD

Pavement Maintenance and Rehabilitation Program FY-21, Chip Seal Applications
Results
$1,000,001 to $2,500,000 est. value
Hagerstown, MD

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Pavement Maintenance
Term Contract
Results

Pavement Maintenance & Rehabilitation Program Fy-'21 Supplementary Contract Hot Mix Asphalt
Results
$1,000,001 to $2,500,000 est. value
MD

Last Updated 01/07/2022 01:47 AM
Project Title

Geometric Improvements at Various Locations in Washington County

Physical Address View project details and contacts
City, State (County) MD   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This area wide project is for the construction of minor geometric improvements at 5 separate locations within Washington County. Locations are shown on the Location Map and described below. The work will consist of the following: A) MD 56 at I-70 Westbound Ramps (approximately milepoint 1.4); Removal of existing pavement, excavation for new pavement, installation of new asphalt paving over graded aggregate base, installation new curb, relocate existing light pole, relocation and installation new signs, installation of pavement markings; B) US 40 at Beaver Creek Rd. (approximately milepoint 40.2);Removal of existing concrete island, installation of new mountable curb concrete island.; C) US 40 at Day Rd (approximately milepoint 39.1);Installation of new raised median and intersection island, excavation, installation of object markers and pavement markings; D) US 340 at Valley Rd. (approximately milepoint 1.8);Installation of new raised median, excavation, installation of signs, object markers and pavement markings; E) US 40 at Greenbrier State Park (approximately milepoint 45.6); Installation of new raised median, excavation, installation of object markers and pavement markings and all other incidentals required to complete the work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents