Similar Projects
Distribution Roof Rfp 2022
Alteration
Bidding
Saint Louis, MO 63110

Facility Management Office Roof
Alteration
Bidding
Saint Louis, MO 63110

Johnson Hall Roof Replacement
Post-Bid
Cape Girardeau, MO 63701

New Metal Roof
Alteration
Post-Bid
Gerald, MO

Roof Replacement, Housing Unit 4
Results
Jefferson City, MO 65101

Turkey Creek and Shoal Creek Wastewater Treatment Facilities, Digester Roof Repairs
Results
$750,000 est. value
Joplin, MO 64801

New Chapel Hill Elementary School - Precast
Alteration
Construction
Gladstone, MO 64119

Natatorium Roof Project
Alteration
Bidding
Clayton, MO

Roof Replacement
Alteration
Post-Bid
$70,000 to $76,000 est. value
Saint Louis, MO 63108

Pet Adoption Center Roof Replacement
Results
Saint Peters, MO 63376

Hazel Grove Elementary School and Lee`s Summit West High School Roofing Replacements
Alteration
Bidding
Lees Summit, MO 64064

Roof Replacement
Alteration
Post-Bid
Arnold, MO

Roof Replacement - Albany Readiness Center
Results
Albany, MO

Roof Replacement and Recovery
Alteration
Bidding
Kearney, MO 64060

Roof Repairs and Installations
Alteration
Post-Bid
Saint Louis, MO 63143

Last Updated 03/29/2022 09:49 AM
Project Title

400 North Second Street Building Roof Repair and Structural Stabilization

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63301   (Saint Charles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All work and services are to be performed by fully insured, qualified and trained journeyman workers with extensive experience of roof assembly and accessory replacements of this type, size and magnitude. Roof. Repairs & Coating to SPUF roof, approximately 1,600 square feet. Power-wash all SPUF surfaces with appropriate roof cleaner and water maintaining 2000psi. Rinse all surfaces to remove cleaning solution & debris. Seal & repair all voids, cracks and wet or punctured foam to the wood deck. Refoam with manufacturer's recommended patch kit as needed. Apply trowel grade acrylic mastic & polyester fabric. Mastic thickness shall be a minimum of 1/16” above and below the fabric. Outside of spot repairs, the entire surface of the raised cornice on the west perimeter must be repaired with mastic and polyester fabric. Allow mastic repairs to cure 24-48 hours prior to coating application. Apply base coat at the rate of 1.5-2 gallons per square. Apply finish coat at the rate of 1.5-2 gallons per square. Furnish & supply Two-year workmanship warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents