Project Title | East Apron Pavement Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Lebanon, TN 37090 (Wilson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,260,490 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of December 7, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** This project consists of mill and overlay of approximately 18,700 square yards of paved aircraft parking and maneuvering area on the east side of the airport (East Apron), including connector taxiway A1 joining the East Apron to the airports main Runway 1-19, along with parts of two connector taxiways (Taxiway A2 and Taxiway A3 from the airports main runway to its parallel taxiway totaling another approximately 2,000 square yards. Other elements include replacement of 98 square yards of asphalt pavement with concrete at a gate entrance, removal of existing tie-downs and installation of new tie-downs with new configuration, and minor grading to the south of the Apron. Each proposal must be accompanied by a Bidders Bond on the form contained in the Proposal from a Surety Company acceptable to the Owner or a Cashiers Check or Certified Check made payable to the City of Lebanon for not less than 5 percent of the total amount of the bid. A 100% Contract Bond will be required upon successful bid as part of the execution of the project contracts. The Owner reserves the right to reject any and/or all bids, to waive any informalities and technicalities in the bids received and to accept any bid which, in its opinion, may be in the best interest of the Owner. The complete examination and understanding of the Plans and Specifications and the proposed work site is necessary in order for the bidder to properly submit a proposal. Proposals/bids are required to remain open for acceptance or rejection for a period of sixty (60) days after the bid opening. Award of this contract is contingent upon the availability of funds. Time limit for completion of the work is as shown on the proposal. The funding of this Project requires a successful bidder to satisfy all requirements of FAA/Federal and/or State Department of Transportation construction contracts, including, but not limited to, Participation by Disadvantaged Business Enterprises (DBE), Affirmative Action, Labor and Wage Rates, and other requirements. Envelopes marked with the Contractors name, Tennessee License Number, Classification, Expiration date and the following project title East Apron Pavement Rehabilitation. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |