Similar Projects
I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 224 at SE Monroe St
Infrastructure
Design
$3,077,537 CJ est. value
Estacada, OR 97023

US26: Salmon River - Zigzag Sec.
Infrastructure
Bidding
$10,000,000 CJ est. value
Sandy, OR 97055

242nd Avenue / Borges Realignment Project
Infrastructure
Bidding
$400,000 CJ est. value
Oregon City, OR 97045

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

US26: SE Kelso Rd - Frog Lake Sno Park Section of the Mt Hood and Warm Springs Highway (Rt. No. US26) beginning in Sandy
Infrastructure
Results
$500,000 to $1,000,000 est. value
Sandy, OR

River Grove Elementary School Replacement - Site Package Project
Infrastructure
Results
Lake Oswego, OR 97035

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Maplelane Road and Walnut Grove Way Mixed-Use
New Construction, Infrastructure - 4,000 SF
Construction
$82,000,000 CJ est. value
Oregon City, OR 97045

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Frog Pond Oaks Subdivision
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Wilsonville, OR 97070

Meek Street Improvements, North Phase - City of Milwaukie
Infrastructure
Conception
$3,090,000 CJ est. value
Milwaukie, OR 97222

Last Updated 04/17/2023 08:24 AM
Project Title

Fischer's Forest Park - Large Onsite Sewage System Treatment Process Upgrade

Physical Address View project details and contacts
City, State (County) Oregon City, OR 97045   (Clackamas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $778,108 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Engineers Estimate: $800,000.00 Bids open- Dial by your location +1 346 248 7799 US (Houston) +1 408 638 0968 US (San Jose) +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 719 359 4580 US +1 253 205 0468 US +1 253 215 8782 US (Tacoma) +1 689 278 1000 US +1 301 715 8592 US (Washington DC) +1 305 224 1968 US +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 360 209 5623 US +1 386 347 5053 US +1 507 473 4847 US +1 564 217 2000 US +1 646 876 9923 US (New York) +1 646 931 3860 US Meeting ID: 890 7425 0046 Find your local number: https://clackamascounty.zoom.us/u/kdwKSE7DX3 Decommissioning the existing treatment system and appurtenances o Installation of one (1) new manhole o Construction of two (2) 3,000 gallon, pre-cast septic tanks o Reconfiguring the existing recirculation tank o Construction of three (3) 3,000 gallon, pre-cast recirculation tanks o Installation of three (3) AdvanTex AX-100 units o Construct two (2) custom flow split structures o Construct approximately 52,000 square feet of subsurface drip distribution system o Installation of a controls shelter o Install custom control and alarm panel o Installation of pumps, pipes, and other necessary appurtenances o Construct a new 1" fresh water service line o Sanitary sewer bypassing Substantial Completion: 180 days from when Contract Times commence Final Completion: 210 days from when Contract Times commence

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents