Last Updated 04/15/2021 07:18 AM
Project Title

Preservation - District 7

Physical Address View project details and contacts
City, State (County) (Allendale, Bamberg, Barnwell, Hampton Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

P040194, P040262, P040263, P040264, P040265 Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 220.000 Sy Borrow Excavation 198.000 Cy Maintenance Stone 7.900 Ton Liquid Asphalt Binder Pg64-22 64.949 Ton Full Depth Asph. Pav. Patching 6" Unif. 790.000 Sy Milling Existing Asphalt Pavement (Variable) 7,450.000 Sy Milled-In Rumble Strip 30.504 Mi Hot Mix Asphalt Surface Course Type d 924.350 Ton Preventative Maintenance Surface Treatment 278,238.660 Sy Driveway Paving-Surface Type d 75.000 Ton Permanent Construction Signs (Ground Mounted) 3,136.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 316.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 184,287.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 222.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 464.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 8.000 Ea White Word Message "Stop Ahead" -Perm.Pvmt.Marking 1.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 1.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 11,785.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 127,960.000 Lf 24" Yellow Solid Lines - Perm.Pvmt.Marking 2,963.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 438.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 188,579.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 444.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 801.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 8.000 Ea Railroad Crossing Symbols - Fast Dry Paint 1.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 23,570.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 255,920.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 5,926.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 300.000 Lf 4"Yellow Solid Lines-Pvt.Edge&No Passing Zone - Epoxy Paint 300.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 1,700.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 19.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,308.000 Ea Removal Of Pavement Markings 5,950.000 Lf Adjust Drop Inlet Adjust d. i. 6.000 Ea Concrete Sidewalk(4" Uniform) 20.000 Sy Detectable Warning Material 120.000 Sf Pedestrian Ramp Construction 200.000 Sy Surface Applied Detectable Warning 120.000 Sf Remove & Dispose Semi-Rigid Gr Device 520.000 Lf Premash w-Beam Strong Post System Wsp3 300.000 Lf Premash w-Beam Compressed Shldr 9' Post 800.000 Lf Premash Thrie Strong Post Guardrail 60.000 Lf Premash Thriebeam Bridge Conn Tbbc3 4.000 Ea Premash Type t Tl3 Leading 50' 11.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 0.960 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents