Similar Projects
Snowplowing and Sanding of Township Roads
Term Contract
Sub-Bidding
McGregor, MN 55760

Brainerd Area Wildlife Management Areas Gravel Delivery Projects
Term Contract
Sub-Bidding
Brainerd, MN 56401

Preventative Maintenance - Backup Generator
Term Contract, Infrastructure
Post-Bid

Preventative Maintenance - Backup Generator
Term Contract, Infrastructure
Post-Bid

Furnish and Install In-Floor Brake Testers at MSP
Term Contract
Results

Furnish and Install In-Floor Brake Testers at MSP
Term Contract
Results

Duct Cleaning Contractor Program for All Campuses
Term Contract
Sub-Bidding
Chanhassen, MN 55317

Snow Removal - Foley Park and Ride
Term Contract
Post-Bid
Coon Rapids, MN 55433

Grand Rapids Area Portable Restrooms
Term Contract
Results
Grand Rapids, MN

Box Culvert Production- CSAH 51
Term Contract
Sub-Bidding
Cologne, MN 55322

Cleaning Service Contracts - Anoka/Washington County Head Start
Term Contract
Post-Bid
Coon Rapids, MN 55433

RFQ - Dilworth Transit Hub
Term Contract
Sub-Bidding
Moorhead, MN 56560

DNR3 RFB North Shore Portable Restroom Service
Term Contract
Post-Bid

2023 Water Treatment Chemicals
Term Contract
Sub-Bidding
Blaine, MN 55434

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Last Updated 12/06/2022 10:28 AM
Project Title

2022 Pond Maintenance Project

Physical Address View project details and contacts
City, State (County) Chanhassen, MN 55317   (Carver County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $610,239 [brand] Estimate
Plans Available from Civil Engineer - 11/22/22
Owner View project details and contacts
Architect View project details and contacts
Description

In general, work consists of the following approximate quantities: 3,910 CY Excavation - Pond and Channel (LV) 1,130 CY Excavation - Pond and Channel (LV) (Special 1) 1,570 TON Excavation - Pond and Channel (LV) (Special 2) 60 EA Clearing and Grubbing 6 EA Remove Miscellaneous Structures 1 EA Const Drainage Structure Design Spec 1 6 EA 15-48" RC Pipe Apron 50 LF 15-48" RC Pipe Sewer 185 CY Random Riprap Class III (Fieldstone) Bid Security in the amount of five percent (5%) of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The OWNER reserves the right to retain the deposits of the three lowest bidders for a period not to exceed 60 days after the date and time set for the opening of bids. No bids may be withdrawn for a period of 60 days after the date and time set for the opening of bids. The OWNER reserves the right to reject any and all bids, to waive irregularities and informalities therein and further reserves the right to award the Contract to the best interests of the OWNER. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. It is anticipated that the bids will be considered by the Chanhassen City Council at their meeting on December 12, 2022.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents