Similar Projects
2019 Gym Floor Refinish and Restoration
Post-Bid
Tampa, FL 33610

M.C Blanchard Judicial Building Carpet Replacement
Post-Bid
Pensacola, FL 32502

Public Safety Building Repairs
Results
Less than $10,100 est. value
Callaway, FL 32404

Replace the Flooring for the Wewahitchka High School Commons Area
Results
Wewahitchka, FL 32465

Composite Coat Floors and Containment Basins at Water/Wastewater Plants
Post-Bid
Less than $750,000 est. value
Tampa, FL 33601

Replacement of Volusia County Fire Stations Concrete Floor Coatings
Results
Less than $32,895 est. value
De Land, FL 32720

Miramar Town Center Building W 2nd Floor Flooring Project
Post-Bid
Miramar, FL 33025

District Energy System (DES) Floor Resurfacing
Results
Jacksonville, FL 32202

Community Center - Flooring
Post-Bid
Port Saint Lucie, FL 34984

Concrete Floor Grinding
Results
$100,000 to $250,000 est. value
Marianna, FL

Regional Park Aquatics Lifeguard Room Flooring
Post-Bid
Miramar, FL 33025

North and Southwest RO WTP Coatings, Gratings, and Access Platform
Results
Cape Coral, FL 33993

Halifax Health Port Orange Hospital Flooring
Post-Bid
Port Orange, FL 32127

Installation of Vinyl Tile at USCG Air Station Miami
Results
Opa-locka, FL

Flooring Replacement for Broward Health Medical Center Atrium Building
Post-Bid
Fort Lauderdale, FL 33316

Reported 04/17/2020 12:00 AM
Project Title

Saints Golf Course Flooring Replacement

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL   (Saint Lucie County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1.Remove/dispose 3,180 sq. ft. existing carpeting and 112 sq. ft. of tile in banquet room and remove 1,200 sq. ft. wooden flooring in restaurant seating area and bar area. • Dispose of all removed items in an approved landfill dumpster provided by contractor. • Clean and prep all flooring substrate to be level and free of cracks, voids, dips, and low areas. Concrete surfacing shall be brought level with new concrete topping before installation of LVT planks. • Remove existing adhesive and check for level and moisture. • Removal of 160’ baseboard located inside the restaurant and bar area only. 2.Supply and install 4,350’ of new LVT plank flooring to substrate. (Color selected upon award). • LVT loose lay/glue down, 5mm thickness,20-22 mill wear thickness, 6” X 48” and 100% fiberglass reinforced recycled PVC construction • City will make selection of the LVT tile as determined in the best interest of the City • Supply and install reducer strip 2” wide 3.Replacement of 160’ baseboard to match existing baseboard. • Prime/paint and install new 6 ½ inch baseboard to match existing baseboard located inside the restaurant and bar area.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents