Similar Projects
HVAC Maintenance and Repair Project
Results
$200,000 est. value
Oklahoma City, OK

HVAC Systems Water Treatment Program
Alteration
Post-Bid
Oklahoma City, OK

J041--Chiller #2, #3, & #4, Repair Oklahoma City VA Health Care System Oklahoma City, OK 73104
Term Contract
Results
Oklahoma City, OK 73104

Annex Building HVAC Replacement
Alteration
Bidding
Oklahoma City, OK 73117

Central Middle School - 2021 HVAC Renovation
Alteration
Post-Bid
Edmond, OK 73034

Will Rogers Elementary HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73142

S21-041 H53 Systems Furniture
Term Contract
Post-Bid
Oklahoma City, OK 73145

Chiller Panel Removal and Replacement
Alteration
Results
$116,000 est. value
Oklahoma City, OK 73102

PAA Boiler
Term Contract
Post-Bid
Oklahoma City, OK 73145

Purchasing and Installation of Air Handler Unit
Alteration
Post-Bid
Oklahoma City, OK 73195

On-Call Building Automation and Controls HVAC - Oklahoma History Center
Alteration
Post-Bid
$15,011 est. value
Oklahoma City, OK

On-Call Services HVAC
Alteration
Post-Bid
Oklahoma City, OK 73105

Bipolar Ionization Units and Installation
Alteration
Post-Bid
Oklahoma City, OK

Chiller Maintenance and On-Call Services
Alteration
Post-Bid
$17,000 est. value
OK 73105

Registry Building - HVAC Controls Upgrade Mike Monroney Aeronautical Center
Alteration
Bidding
Oklahoma City, OK 73169

Last Updated 10/14/2021 12:39 PM
Project Title

Z1da--635-22-148 Correct Research Ventilation System (Va-21-00026378)

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73104   (Oklahoma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace four existing exhaust fan units and to supply and install 4 factory roof curbs for mounting the new exhaust fan units safely and securely to the Research Facility Roof. Contractor shall also be required to modify the two existing stainless steel plenums by removing two existing plenum dampers from each of the two existing stainless steel plenums located between exhaust fan units 1A and 1B on the North end and exhaust fan units 2A and 2B on the South end of the Research Facility roof. Contractor shall be responsible for identifying and replacing all equipment, parts and labor required to correct the Research Facility Ventilation System. The medical center requires a Contractor to furnish all labor and materials needed to completely prepare the site for building operations, including all demolition, removal, and installation

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Duct Accessories, Dampers, Special Exhaust Systems, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents