Similar Projects
The Cottages at Bethany
New Construction
Conception
Statesboro, GA 30458

Montebello - Phase III
New Construction
Conception
Cumming, GA 30028

Encore
New Construction
Design
Duluth, GA

Bethesda Park
New Construction
Design
Lawrenceville, GA 30044

Construction and Modifications at Doerun Housing Authority
New Construction
Bidding
Doerun, GA 31744

Homeowner Rehabilitation and Reconstruction Program
Renovation
Bidding
Brunswick, GA 31525

Various Modifications at One Development
Renovation
Post-Bid
Quitman, GA 31643

Weatherization HVAC and Electrical Services
Renovation
Post-Bid
GA

Repairs to Fire Damaged Unit at 825 Spruce Street, Apt 90, MM Scott, GA001000120
Results
Augusta, GA

Family Housing New Construction (PN87205), Fort Gordon, GA
New Construction
Results
$5,000,000 to $10,000,000 est. value
Fort Gordon, GA

Twelve Parks
New Construction
Construction
Sharpsburg, GA 30265

Porches at Mobley Lake - Site Only
New Construction
Construction
$3,000,000 to $4,000,000 est. value
Dacula, GA 30019

Old Norcross Road Investments
New Construction - 100,800 SF
Pending Verification
$10,000,000 CJ est. value
Buford, GA

Overlook Park
New Construction - 1,600 SF
Pending Verification
Flowery Branch, GA 30542

Wheeler Tract
New Construction
Conception
Ball Ground, GA 30107

Reported 04/15/2020 12:00 AM
Project Title

Sale and Development of Residential Property - Harper`s Farm

Physical Address View project details and contacts
City, State (County) Newnan, GA 30263   (Coweta County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sale and development of residential property located at 50 Sprayberry Road Newnan, Georgia 30263. More specifically, the City seeks a qualified developer to purchase and improve 1.82 acres of property at the intersection of Sprayberry Road and Casey Road for residential use. The City will consider all purchase offers and development proposals that contemplate a future use of the property compatible with the surrounding neighborhood.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents