Similar Projects
Antioch Road District Materials Supply
Post-Bid
Antioch, IL 60002

Supply of Asphalt Emulsion, Sealer Materials
Term Contract
Post-Bid
West Chicago, IL 60185

Golf Center Pavement Maintenance
Results
Des Plaines, IL 60016

Roadway & Bridge Widening & Reconstruction
Results
Chicago, IL 60600

A1 and A2 Seal Coat
Post-Bid
Amboy, IL 61310

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

Reclamite Asphalt Rejuvenator and CRF Restorative Seal
Post-Bid
Johnsburg, IL

2020 Street Resurfacing Program
Results
Elgin, IL 60120

Annual Crack Seal and Seal Coating
Post-Bid
Joliet, IL 60433

Sealcoating
Renovation
Results
Island Lake, Wauconda, IL 60084

Annual Asphalt Repair and Replacement
Post-Bid
Joliet, IL 60433

Harmony Road Bridge Repairs
Renovation
Results
$93,995 est. value
Marengo, IL 60152

Street Maintenance Materials
Post-Bid
Park Ridge, IL 60068

2020 Street Improvements
Results
Glenview, IL 60026

Surface Pavement Repairs
Term Contract
Post-Bid
Rockford, IL 61109

Last Updated 08/03/2020 08:23 AM
Project Title

Construction of Additional Truck Parking Lot Adjacent to the Existing Lots at Both the Northbound and Southbound Trail of Tears Rest Area on I-57, North of IL 146

Physical Address View project details and contacts
City, State (County) IL   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves construction of a new PCC Pavement truck parking lot adjacent to the existing truck lot at the NB and SB Rest Areas. The proposed lots will allow for 13 new stalls at NB location and 21 new stalls at SB location. Existing curb and gutter at both locations will be removed in order to tie-in new pavement and new Combinaiton Concrete Curb and Gutter will be installed. Additional work includes tree removal, earthwork, seeding and pavement marking. This improvement consists of a truck parking lot expansion at the Northbound and Southbound Trail of Tears Rest Areas on I-57 in Union County, north of IL 146 at approximate mile post 32. 20100500 Acre Tree Removal, Acres Base Items 2.100 20200100 Cu Yd Earth Excavation Base Items 818.000 20400100 Cu Yd Borrow Excavation Base Items 18,511.000 25000200 Acre Seeding, Class 2 Base Items 1.100 25000350 Acre Seeding, Class 7 Base Items 1.100 25000400 Pound Nitrogen Fertilizer Nutrient Base Items 99.000 25000500 Pound Phosphorus Fertilizer Nutrient Base Items 99.000 25000600 Pound Potassium Fertilizer Nutrient Base Items 99.000 25000700 Ton Agricultural Ground Limestone Base Items 2.200 25100630 Sq Yd Erosion Control Blanket Base Items 5,325.000 28000250 Pound Temporary Erosion Control Seeding Base Items 110.000 28000305 Foot Temporary Ditch Checks Base Items 196.000 28000400 Foot Perimeter Erosion Barrier Base Items 940.000 28100105 Sq Yd Stone Riprap, Class a3 Base Items 89.000 31100500 Sq Yd Subbase Granular Material, Type a 6" Base Items 10,520.000 31200100 Sq Yd Stabilized Subbase 4" Base Items 10,389.000 42000501 Sq Yd Portland Cement Concrete Pavement 10" (Jointed) Base Items 9,634.000 42001300 Sq Yd Protective Coat Base Items 10,232.000 44000500 Foot Combination Curb And Gutter Removal Base Items 1,433.000 44004250 Sq Yd Paved Shoulder Removal Base Items 92.000 44213204 Each Tie Bars 3/4" Base Items 365.000 50104400 Each Concrete Headwall Removal Base Items 1.000 50105220 Foot Pipe Culvert Removal Base Items 40.000 60100060 Each Concrete Headwalls For Pipe Drains Base Items 1.000 60236800 Each Inlets, Type a, Type 11 Frame And Grate Base Items 1.000 60600095 Cu Yd Class Si Concrete (Outlet) Base Items 9.600 60606800 Foot Combination Concrete Curb And Gutter, Type b-9.18 Base Items 2,133.000 66900200 Cu Yd Non-Special Waste Disposal Base Items 82.000 66900530 Each Soil Disposal Analysis Base Items 1.000 66901001 Lsum Regulated Substances Pre-Construction Plan Base Items 1.000 66901003 Lsum Regulated Substances Final Construction Report Base Items 1.000 66901006 Cal Da Regulated Substances Monitoring Base Items 2.000 67100100 l Sum Mobilization Base Items 1.000 70107025 Cal Da Changeable Message Sign Base Items 28.000 78009000 Sq Ft Modified Urethane Pavement Marking - Letters And Symbols Base Items 12.400 78009004 Foot Modified Urethane Pavement Marking - Line 4" Base Items 4,107.000 81028750 Foot Underground Conduit, Coilable Nonmetallic Conduit, 2" Dia. Base Items 140.000 81603010 Foot Unit Duct, 600v, 2-1c No.10, 1/c No.10 Ground, (Xlp-Type Use), 3/4" Dia. Polyethylene Base Items 980.000 82110014 Each Luminaire, Led, Highmast, Output Designation g Base Items 24.000 83502400 Each Light Tower, 100 Ft. Mounting Height, Luminaire Mt. - 6 Base Items 4.000 83700300 Foot Light Tower Foundation, 48" Diameter Base Items 92.000 89502300 Foot Remove Electric Cable From Conduit Base Items 1,410.000 x0327980 Sq Ft Pavement Marking Removal - Water Blasting Base Items 109.900 x1400273 Each Removal Of Existing Tower Luminaire, No Salvage Base Items 24.000 x6050700 Each Remove Inlet Box Base Items 1.000 x7010216 l Sum Traffic Control And Protection, (Special) Base Items 1.000 x8420502 Each Removal Of Light Tower, No Salvage Base Items 4.000 x8420510 Each Removal Of Tower Foundation Base Items 4.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents