Similar Projects
KSR Warehouse Roof Repair
Bidding
La Grange, KY 40031

Academy Campus Roof Replacement
Bidding
$239,664 est. value
Frankfort, KY 40601

Campbell County Police Station Reroof
Post-Bid
Alexandria, KY

Administrative Building Roof Replacement
Post-Bid
Cadiz, KY 42211

Sharp Middle School Roof
Results
Less than $368,000 est. value
Butler, KY

Replace a Barn Roof
Results
Independence, KY 41051

Boone County Schools Roofing 2020
Post-Bid
Florence, KY 41042

Replace Basement Windows at Golden Tower With Some Limited Acoustical Ceiling and HVAC Work
Results
Covington, KY

Roofing Envelope Services
Post-Bid

Roofing
Results
Lexington, KY 40513

Roofing Repair and Maintenance
Post-Bid

Carlisle Readiness Center Roof Replacement
Results
Less than $247,989 est. value
Carlisle, KY 40311

Partial Roof Replacement at Various Schools
Post-Bid
Louisville, KY 40299

Roof Replacement - Bowman Field License Branch
Results
Louisville, KY 40205

Partial Roof Replacement at Various Schools
Renovation
Post-Bid
Louisville, KY 40215

Last Updated 01/27/2021 05:13 PM
Project Title

General Butler Lodge Complex East Roof Replacement - RE-ADVERTISEMENT OF RFB-66-21

Physical Address View project details and contacts
City, State (County) Carrollton, KY 41008   (Carroll County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $405,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal of existing shingle and Modified Bitumen roofing systems, installation of new asphalt shingle and modified bitumen roofing systems over existing building, miscellaneous minor repairs to roof edge condition, and roof edge drainage systems as follows: 1. Remove existing asphalt shingles and underlayment to decking. 2. Remove selected areas of existing gutters, downspouts, and metal roof trim. 3. Remove existing modified bitumen, flashings and insulation to decking 4. Remove selected areas of scuppers, water heads, downspouts and metal roof trim 5. Install new vented composite nail base. 6. Install new underlayment, including ice and water shield. 7. Install new 40-year, asphalt shingles. 8. Install new insulation system, taper as required 9. Install new modified bitumen roof system 10. Install new metal components. 11. Install new prefinished galvanized steel gutters, downspouts, and trim. 12. Install new PVC storm drain below grade and connect to existing downspouts with cast iron boots.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents