Similar Projects
Jones Farm
New Construction, Infrastructure
Conception
$704,300,000 CJ est. value
Duette, FL 34219

Park East at Azario Phase II / Bradenton
New Construction, Infrastructure
Design
$37,565,184 CJ est. value
Bradenton, FL 34205

Key Packaging Building Addition
Addition, Infrastructure - 11,250 SF
Design
$1,200,000 CJ est. value
Sarasota, FL 34243

Quick Turn Around Rental Car Facility (Precast Bldgs and Overflow Lot) - BP 2
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Sarasota, FL 34243

GA Federal Inspection Station Facility - Sarasota-Bradenton Intl Airport (SRQ)
New Construction, Infrastructure - 6,000 SF
Bidding
$2,000,000 CJ est. value
Sarasota, FL 34243

Riverview6
New Construction, Infrastructure - 96,067 SF
Post-Bid
$18,000,000 CJ est. value
Bradenton, FL 34205

RFP D/B - Design-Build Services for Colony Cove Pipeline Replacements and Phase 1 Replacements
Infrastructure
Post-Bid
$300,000 CJ est. value
Bradenton, FL 34205

Connor Park Construction
Results
Less than $3,804,637 est. value
Palmetto, FL 34221

Excavation Services
Infrastructure
Results
FL

Silverstone North - Site Only
New Construction
Construction
Palmetto, FL 34221

Riverwalk East Expansion
Construction
$7,000,000 est. value
Bradenton, FL

Ellenton Theatre and Hotel
New Construction, Infrastructure - 170,000 SF
Pending Verification
$130,000,000 CJ est. value
Ellenton, FL 34222

Watercolor Place - Phase II
New Construction, Infrastructure
Pending Verification
$38,000,000 CJ est. value
Bradenton, FL 34212

Woodie's Wash Shack / Lakewood Ranch
New Construction, Infrastructure - 5,500 SF
Design
$1,400,000 CJ est. value
Bradenton, FL 34202

Harrison Ranch Self Storage / Parrish
New Construction, Infrastructure - 99,993 SF
Bidding
$8,000,000 CJ est. value
Parrish, FL 34219

Last Updated 09/08/2022 12:10 PM
Project Title

Washington Park Phase 2 - 6012610 - Manatee County

Physical Address View project details and contacts
City, State (County) Palmetto, FL 34221   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2021
Bids Due View project details and contacts
Estimated Value $625,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project calls for site restoration including placement and contouring of approximately 300,000 cubic yards of dredged material from Port Manatee for filling approximately 20 acres of marsh land to create a community asset for recreation and stormwater quality improvements. Washington Park is designed to be completed in three phases. This project is for Phase II which consists of final design and site stabilization for park in-fill project, in partnership with the US Army Corps of Engineers (ACOE). Project is included in Manatee County FY 2021-2025 Capital Improvement Program (CIP). As of August 11, 2021, the project is in design. Schedules for bidding and construction have not been disclosed at this time, but is not expected to occur before fourth quarter 2021. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents