Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Bidding
$180,000 est. value
Ely, IA

Replacement of Parking Lot at Downtown Library
Infrastructure
Bidding
Cedar Rapids, IA 52401

Mount Vernon Business 30 Resurfacing and Improvements
Infrastructure
Post-Bid
Mount Vernon, IA

Mount Vernon Business 30 Resurfacing and Improvements
Infrastructure
Post-Bid
Mount Vernon, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

2021 Curb and Gutter Rehabilitation
Infrastructure
Results
Less than $890,000 est. value
Cedar Rapids, IA 52405

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Derecho Sidewalk, Driveway and Miscellaneous Pavement Repair
Infrastructure
Results
$350,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

A Street SW from 1st Street to Bowling Street Sanitary Sewer Lining
Infrastructure
Post-Bid
$3,220,000 est. value
Cedar Rapids, IA

11th Avenue Storm Sewer
Infrastructure
Results
$225,000 est. value
Hiawatha, IA 52233

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Last Updated 08/13/2021 01:42 PM
Project Title

Hiawatha Turtle Creek Park Phase 2

Physical Address View project details and contacts
City, State (County) Hiawatha, IA   (Linn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 2,400 SY of asphalt driveway and parking lot, 1,080 LF of concrete curb & gutter, 3,700 SY of asphalt recreational trail, 450 LF water main extension, 280 SY of concrete sidewalk, 850 LF of subdrain, stormwater control structure, 45 SQ of sodding, 3.3 acres of hydraulic seeding, tree plantings, landscape area, and the installation of playground equipment & tile surfacing. The bid project will include alternative bids for the installation of a Vortex splash pad including concrete sidewalk, electric service, water service and drain; 1,100 SY concrete trail extension along Fitzroy Road; and 100 LF storm drain extension to Fitzroy Road.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents