Similar Projects
IH0010 - Winter Weather Material
Infrastructure
Bidding
$284,000 est. value
TX

Emulsion
Infrastructure
Bidding
TX

Material Only Delivery HMA
Post-Bid
Less than $280,250 est. value
TX

Concrete and Flowable Fill Backup Material
Post-Bid
Less than $41,600 est. value
TX

Asphaltic Concrete Patching Material Only
Results
Less than $18,600 est. value
TX

Screened Top Soil for Row Restoration
Results
Midlothian, TX 76065

Asphalt Treated Road Material, Bituminous Cold Patch Material and Asphaltic Concrete Hot Mix and Recycled Asphalt Product
Term Contract
Bidding
TX

Flexible Base (Material Only)
Post-Bid
Less than $79,044 est. value
TX

US0080 - Rock/Riprap
Results
Less than $84,000 est. value
TX

US0183 - Winter Weather Material (Salt and Complex Chloride)
Infrastructure
Bidding
$104,297 est. value
TX

Liquid Asphaltic Material
Term Contract
Post-Bid
Gonzales, TX 78629

US0080 - Materials Only: Hydraulic Cement Concrete
Results
Less than $61,400 est. value
TX

Miscellaneous Road Materials
Post-Bid
La Grange, TX 78945

SL0304 - Hot-Mix Cold-Laid
Results
$91,800 est. value
TX

Asphalt Material
Term Contract
Post-Bid
Lockhart, TX 78644

Reported 10/13/2021 12:00 AM
Project Title

Material and Supply Items

Physical Address View project details and contacts
City, State (County) TX   (Panola County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Material & Supply Items Estimated Annual Quantity Road Oil (cracked fuel oil) 100,000 tons Corrugated Steel Pipe Culverts 30 pipe Polyethylene Corrugated Culverts 3000 linear feet Gravel 2000 yards Used railroad tank cars/flat cars 4tank/4flat cars Concrete/iron ore 2000 yards Crushed Limestone 2000 tons Diesel and Gasoline 50,000 gals/40,000 gals Asphalt Materials 100 tons of oil sand Asphalt Materials 100 tons of hot oil sand Asphalt Materials 100 tons of hot mix asphalt.

Details

Division 01 - General Requirements, Temporary Utilities, Temporary Fuel Oil.
Division 32 - Exterior Improvements, Base Courses, Aggregate Base Courses, Aggregate Surfacing, Crushed Stone Surfacing.
Division 33 - Utilities, Culverts, Pipe Culverts, Subdrainage, Drainage Layers, Gravel Drainage Layers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents