Similar Projects
New Brunson Elementary School
New Construction
Conception
Winston-Salem, NC 27101

New Rosewood Middle School
New Construction
Conception
Goldsboro, NC

New K-8 Facility
New Construction, Renovation - 155,000 SF
Design
$55,000,000 est. value
NC

H12 New High School
New Construction - 360,000 SF
Design
$170,000,000 est. value
Apex, NC 27539

Peck K-8 Expeditionary Learning School - BP #3: Remaining Building Packages
New Construction - 140,000 SF
Bidding
$30,000,000 est. value
Greensboro, NC

Easton Elementary School Community Center
Renovation
Bidding
$2,200,000 est. value
Winston-Salem, NC 27107

RFQ Contractor - New Brooks Global Studies Elementary School - Phase I
New Construction, Infrastructure - 80,000 SF
Sub-Bidding
$27,000,000 CJ est. value
Greensboro, NC 27403

Gibson Elementary School ERV Replacement
Renovation
Sub-Bidding
$150,000 CJ est. value
Winston Salem, NC 27106

Brevard High School
Renovation, Addition - 272,670 SF
Post-Bid
Brevard, NC 28712

Philo Hill Middle Renovation Addition School
Renovation, Addition, Demolition
Post-Bid
Winston-Salem, NC 27127

Columbia High School Learning Lab
Results
Columbia, NC 27925

Additions and Renovations to Lakeshore Elementary School
Renovation, Addition - 103,424 SF
Results
Mooresville, NC 28117

ABSS New High School
New Construction - 221,000 SF
Construction
NC

York Elementary School
- 110,000 SF
Construction
Raleigh, NC

Alternative Programs School Renovation
Renovation
Conception
Greensboro, NC 27401

Reported 07/22/2022 12:00 AM
Project Title

Retro-Commissioning and Tabat Koontz, Millbridge ES, and Shive ES and Carson HS

Physical Address View project details and contacts
City, State (County) Salisbury, NC   (Rowan County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal: 10%. The Work generally consists of retro-commissioning and TAB work at Koontz ES, Millbridge ES, Shive ES, and Carson HS as described below: Koontz ES - Retro-commissioning and TAB work for existing indoor air handling units with hot water and chilled water coils. The units are located on equipment mezzanines. 685 E Ritchie Road, Salisbury, NC 28146. Millbridge ES - Retro-commissioning and TAB work for existing indoor air handling units with hot water and chilled water coils. The units are located on equipment mezzanines. 155 Ed Deal Road, China Grove, NC 28023. Shive ES - Retro-commissioning and TAB work for existing indoor air handling units with hot water and chilled water coils. The units are located on equipment mezzanines. 655 Holshouser Road, Rockwell, NC 28138. Carson HS - Retro-commissioning and TAB work for existing indoor air handling units with hot water and chilled water coils. The units are located on equipment mezzanines. 290 Kress Venture Drive, China Grove, NC 28023.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents