Similar Projects
Last Updated | 11/03/2020 10:34 AM |
Project Title | J041--13th Floor Steam Station Replacement (VA-20-00048546) |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33125 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Miami VA Healthcare System, Engineering Service requires the replacement of xisting Steam station for the facility Re-heat system on 13th floor. 4.1 The Contractor will furnish all materials including Steam Regulating Valve (Spence series), Control Pilot for regulating valve, Relief valve, 300psi gate valves, y-strainer, pressure gauges, pigtails, various nipples, reducers, 300psi black iron piping and insulation. 4.2 The contractor will all labor and equipment for replacing of existing Steam Station for 13th floor Re-heat system. 4.3 The contractor shall insulate all steam piping and valves with current insulation for steam systems. 4.4 The Contractor shall dispose of all trash and debris provided by the VAMC. 4.5 The contractor will ensure a fire extinguisher is readily available in the event of any smoke. 4.6 All work performed shall be in compliance with any manufacturer’s recommendations and applicable NEMA, NEC, ANSI, and VA standards. 4.7 The contractor shall perform immediately coordinating with the government at the convenience of the government. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |