Last Updated | 11/15/2022 10:34 AM |
Project Title | Wastewater System Improvements Project - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Santa Fe, NM 87501 (Santa Fe County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of November 15, 2022, this project has not yet been awarded. A timeline for award has not yet been established. PN-20211 Job No. 1-20608 The Project includes the following Work: Work of the Project includes the installation of approximately 15,567 linear feet (LF) of 8-inch PVC gravity sewer line along with manholes. Sewer service will be extended to thirty-nine (39) existing homes and four (4) vacant tribal facilities currently on individual septic systems by installing approximately 5,642 LF of 4-inch PVC SDR-26 sewer service lines, including cleanouts per the International Plumbing Code (IPC) requirements. Two grinder pumps will be installed at individual homes for the service connections. Existing septic tanks for the 39 facilities will be pumped empty, demolished, filled with sand and abandoned. The system will also include 2 lift stations; one at the Pueblo South area, and one within the Pueblo Center area. Approximately 8,531 LF of 1.5-inch and 6-inch HDPE DR 17 low pressure sewer force main will also be installed. The Project has an expected duration of 460 calendar days. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |