Similar Projects
Clay Street Sewer Separation Park Street to Main Street
Alteration
Bidding
Hackensack, NJ

Water Main, Sanitary Sewer and Storm Water Facility Repairs
Post-Bid
Fair Lawn, NJ 07410

Water Main, Sanitary Sewer and Storm Water Facility Repairs
Post-Bid
Fair Lawn, NJ 07410

Knickerbocker Road Sanitary Sewer Improvements
Results
Englewood, NJ

Exterior and Interior Industrial Utility Construction Services
Term Contract
Results
Hackensack, NJ 07601

Main Street Sewer Separation Mercer Street to Berry Street
Post-Bid
Hackensack, NJ 07601

Maintenance Stormwater Facilities Restoration Contract, North - 2020
Results
$5,000,001 to $10,000,000 est. value

Sewer Maintenance Service
Term Contract
Post-Bid
Cliffside Park, NJ 07010

Teterboro Airport - Storm Drainage System Rehabilitation - Phase II
Results
$5,000,000 to $10,000,000 est. value
Teterboro, NJ 07608

Cleaning and Closed Circuit Television Inspection of Storm Drain Systems
Post-Bid
Bayonne, Fort Lee, Jersey City, Newark, Teterboro, NJ - New Windsor, NY 07608

Emergency Repair of Sanitary and Storm Sewer
Results
Teaneck, NJ 07666

Construction Management Services
Post-Bid
Little Ferry, NJ

Main Street Sewer Separation Atlantic Street to Mercer Street
Results
Hackensack, NJ 07601

Downtown Business District Culvert Video Inspection and Cleaning
Post-Bid
Hackensack, NJ

Sewer Maintenance and Rehabilitation Emergency Service
Term Contract
Results
Teterboro, NJ 07608

Last Updated 05/24/2021 09:24 AM
Project Title

2021 Storm and Sanitary Sewer Improvements at Manchester Road

Physical Address View project details and contacts
City, State (County) River Edge, NJ 07661   (Bergen County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes approximately: BASE BID: Installation, operating and maintaining a 5" Hydraulic Pump, Excavation of approximately 580 C.Y. of trenches, The removal and replacement of 560 L.F. of sanitary sewer main with 8" Polyvinyl Chloride Pipe (AWWA C900), the reconnection of 16 sewer laterals to the proposed sanitary sewer main, the removal and replacement of a sanitary sewer manhole, the installation of a storm manhole, 3 type "B" inlets, 44 L.F. of 15" Reinforced Concrete Pipe and 44 L.F. of 12" Reinforced Concrete Pipe, 2,659 S.Y. of HMA Milling, 3" or Less (2" Pay Limit), 366 Ton of Hot Mix Asphalt 12.5 M64 Surface Course, 2" Thick, 130 Ton of Hot Mix Asphalt 19M64 Base Course, 8" Thick and other related improvements to complete the project. ALTERNATE BID: 44 L.F. 12" Polyvinyl Chloride Pipe, AWWA C900, Storm Sewer as an alternate material in place of 12" Reinforced Concrete Pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents