Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$750,000 est. value
WA

Downtown Stormwater Treatment Project
Infrastructure
Bidding
$10,400,000 est. value
Marysville, WA

Chief Joseph Dam Spillway Sump Pumps and Controls
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Bridgeport, WA 98813

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Illinois Well Facility
Infrastructure
Results
$3,025,682 to $3,276,814 est. value
Ellensburg, WA

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Tacoma Landfill Decommission Gets and Gas Probes
Infrastructure
Results
$593,000 est. value
Tacoma, WA 98421

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

New Water Supply Well Five
Infrastructure
Results
$235,000 est. value
Freeland, WA

Last Updated 01/21/2022 03:46 PM
Project Title

Furnish and Install 60HP Input Pump Motor

Physical Address View project details and contacts
City, State (County) Ridgefield, WA 98642   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and Install 60HP Input Pump Motor for the U.S. Fish & Wildlife Service, FWS Ridgefield NWR, Bachelor Island (BI) Unit of the Ridgefield National Wildlife Refuge: Required services include: - Ordering a 60 HP submersible pump appropriate for the existing pump housing. - Disassemble the old pump. - Mobilize/Demobilize a crane to remove the old pump and place the new pump on the pump platform over the waterbody. - Crane operator for pump removal and pump placement. - Reinstall pump, connect drive shafts/impellers, reconnect electrical components, and reconnect safety devices/floats/timers. - Misc. materials, fittings, and electrical supplies and services. - Test all mechanical and electrical components.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists, Cranes.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents