Similar Projects
Last Updated | 07/02/2020 10:01 AM |
Project Title | Gordy Road Water Main Extension Construction |
Physical Address | View project details and contacts |
City, State (County) | Salisbury, MD (Wicomico County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contract encompasses the construction of a 24 inch water main extension from Darwin Drive to Beaglin Park Drive along Gordy Road. It includes the installation of water main by direct bury, inside a 36 inch jacked and bored steel casing pipe for 176 feet +/- with a directionally drilled section of 525 feet +/-. The work also includes removal of existing roadway pavement for the installation of new 24 inch water main. The total length of the water main is approximately 5,268 feet +/-. The work includes full depth pavement reconstruction and mill/overlay of existing pavement as indicated on the drawings and plans. A Traffic Control Plan has been developed for the project using the “Single Lane Closure” method of construction. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |