Similar Projects
Maple Street Interior Plumbing Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Pittsburgh, PA 15204

Dewatering Pumps
Term Contract
Post-Bid
Pittsburgh, PA 15226

South Park Administration Building HVAC - Heating, Ventilating and Air Conditioning/Plumbing
Alteration
Results
South Park Township, PA 15129

Capital Improvements 2022-2023 - Plumbing Construction
Alteration
Results
$700,000 est. value
Oakmont, PA

Repairs to Plumbing Systems
Term Contract
Post-Bid
Pittsburgh, PA 15219

Mooncrest Community Center Interior Renovations - Plumbing Contract
Alteration
Results
$293,200 est. value
Coraopolis, PA 15108

On-Call Plumbing Services
Term Contract
Post-Bid
Pittsburgh, PA 15219

Manchester Redevelopment - Plumbing
Demolition, New Construction, Infrastructure
Results
$2,095,555 CJ est. value
Pittsburgh, PA 15233

Plumbing Materials
Term Contract
Post-Bid
Pittsburgh, PA 15219

Bus Rapid Transit (BRT) Downtown Loop
Infrastructure
Results
$27,893,876 CJ est. value
Pittsburgh, PA 15219

Penn Hills WPCD Concrete Repairs and Installations Project
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Penn Hills, PA 15147

(Re-Bid) Mccabe Run Stream Restoration
Infrastructure
Results
$160,325 CJ est. value
Coraopolis, PA 15108

Plumbing Supplies
Term Contract
Post-Bid
Pittsburgh, PA 15219

2023 Stormwater Improvements Project
Infrastructure
Results
$108,764 CJ est. value
Ohio Township, PA 15237

Plumbing Supplies
Term Contract
Post-Bid
Pittsburgh, PA 15219

Last Updated 10/09/2023 11:01 AM
Project Title

24" Transmission Main Contract

Physical Address View project details and contacts
City, State (County) Hampton Township, PA 15101   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $889,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 9,2023, project was awarded, Anticipated start date is late of this October. and will be completed by end of this year** Estimated project cost: $875,000 The work under contract no. 2023-01 generally consists of construction of approximately 300 lineal feet of 24-inch diameter ductile iron water main and appurtenances via open cut, and approximately 334 lineal feet of 24-inch diameter fusible PVC water main and appurtenances via horizontal directional drilling. Work shall also include the installation of drilled rock anchors and thrust blocking where indicated on the contract drawings. The owner will supply the 24-inch ductile iron pipe and 1 EA 24-inch butterfly valve for installation by the contractor. The owner will furnish and install the surge relief vault. The contractor shall furnish and install all other materials. CLARIFICATION DEADLINE 8/18/2023 4:00 PM All questions about the meaning or intent of the Contract Documents shall be submitted to ENGINEER in writing via PennBid's "Questions" tab. Replies will be issued by Addenda, posted within PennBid's "Documents" tab, and an email notice will be sent to all parties recorded as having received the Bidding Documents. Questions received less than five days prior to the date of bid opening may not be answered. Only interpretations written by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The Work under Contract No. 2023-01 generally consists of construction of approximately 300 lineal feet of 24-inch diameter ductile iron water main and appurtenances via open cut, and approximately 334 lineal feet of 24-inch diameter fusible PVC water main and appurtenances via horizontal directional drilling. Work shall also include the installation of drilled rock anchors and thrust blocking where indicated on the Contract Drawings. The OWNER will supply the 24-inch ductile iron pipe and 1 EA 24-inch butterfly valve for installation by the CONTRACTOR. The OWNER will furnish and install the surge relief vault. The CONTRACTOR shall furnish and install all other materials.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents