Similar Projects
Interior Painting at the Library
Alteration
Bidding
Fayetteville, GA 30214

Painting of Roofing Panels and Related Components
Alteration
Bidding
Statesboro, GA 30461

Contract for Pressure Washing and Painting
Post-Bid
East Point, GA 30344

Painting Services
Term Contract
Post-Bid
Jonesboro, GA 30236

Z--Prep/Paint Exterior of Bldg-St Marys, GA
Results
$100,000 to $250,000 est. value
Saint Marys, GA 31558

Atrium Painting for Fulton County Government
Results
Atlanta, GA 30303

Aquatic Center Painting
Post-Bid
Augusta, GA 30900

Aircraft Static Display Painting
Results
Garden City, GA 31408

Painting of Water Tanks
Post-Bid
Port Wentworth, GA 28303

2021 Coatings Program
Results
Less than $348,470 est. value
Acworth, Marietta, GA 30101

Repainting of Burt's Crossing Elevated Tank
Post-Bid
Dawsonville, GA 30534

Interior Renovations for Berrien High School
Results
Nashville, GA 31639

Painting the Cafeteria at the Richmond Hill Community Education Building
Post-Bid
Richmond Hill, GA 31324

Painting and Pressure Washing at Select Schools
Results
Less than $53,000 est. value
Covington, GA

Dooly County K-8 and High School Painting
Post-Bid
Pinehurst, GA 31070

Reported 12/11/2021 12:00 AM
Project Title

Apartment Make Ready 2021

Physical Address View project details and contacts
City, State (County) Warner Robins, GA   (Houston County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Contractor shall supply trained unit turn professionals to perform unit turning services as directed. The contractor will also provide all paint, caulking, all equipment and cleaning supplies associated with painting. Patch surfaces to be painted as needed. Clean all surfaces to be painted. Apply painter’s caulking in a continuous bead as needed. Apply two coats of paint to all surfaces that are painted. Remove all paint from all surfaces that are not to be painted, including but not limited to floors, electrical outlets, doorknobs etc… Clean all appliances and surfaces in the kitchen. Clean all fixtures, basins, toilets tubs and surfaces in the bathroom. Clean out all utility closets / rooms. Wash all windows. Clean the surfaces of all exterior doors and storm doors. Clean and mop all stoops. Buff, wax and seal all tile floors; replace tile and baseboard as needed. Remove all trash, empty paint buckets, empty bottles of cleaning supplies from the apartment; they cannot be put in trashcans; they must be removed by the cleaning company.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents