Similar Projects
Runway 18/36 and Taxiway A Pavement Maintenance
Bidding
Foley, AL 36535

Remark Runway 12/30 at Jeremiah A. Denton Airport
Bidding
Dauphin Island, AL 36528

Improvements to Dothan Regional Airport
Post-Bid
Dothan, AL

Construction of Scottsboro Airport Apron Reconstruction
Post-Bid
Scottsboro, AL 35768

Corporate Hangar Apron Rehabilitation
Results
Less than $2,015,057 est. value
Birmingham, AL 35212

Reconstruct Runway 4-22 at the Tuscaloosa National Airport
Results
Tuscaloosa, AL 35401

The Surface Rehabilitation of Airfield Pavement Located Between Taxiways A3 and A4
Post-Bid
Talladega, AL 35160

Taxiway Connector Relocation at Cullman Regional Airport
Results
Vinemont, AL 35179

Runway 14-32 Rehabilitation
Post-Bid
Mobile, AL 36615

Taxiway and Taxilane Seal Coat Surface Treatment
Results
Less than $490,000 est. value
Tanner, AL 35671

Pavement Maintenance - Runway 18/36 at Atmore Municipal Airport
Results
Less than $225,927 est. value
Atmore, AL 36502

Corporate Taxilane
Results
Less than $278,981 est. value
Albertville, AL 35950

Rehabilitate Apron and Access Road at Camden Municipal Airport
Results
$250,000 to $300,000 est. value
Camden, AL 36726

St. Clair County Airport Taxilane Development - Phase 1
Results
Pell City, AL

Replace Runway 12/30 MIRL 26.53
Results
$475,000 to $525,000 est. value
AL

Last Updated 05/27/2020 08:23 AM
Project Title

Southwest Apron Pavement Maintenance at H.L. Sonny Callahan Airport

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $220,000 to $240,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work include the Pavement Maintenance of the Southwest Apron at the H.L. "Sonny" Callahan Airport. Approximate quantities include: 1. Thermoplastic Coal Tar Emulsion Sand Slurry Seal - 29,000 SY 2. Crack Sealing - 14,000 LF 3. Markings - 9,450 SF.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents