Similar Projects
PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

Poplar Street Townhomes
New Construction, Infrastructure - 15,436 SF
Design
$6,000,000 CJ est. value
North East, PA 16428

SR 8009 Ramp C over I-79
Infrastructure
Design
$75,000 CJ est. value
Erie, PA 16501

SR 3006: SR 90 to SR 3003
Infrastructure
Bidding
$5,000,000 CJ est. value
Conneaut Township, PA 16401

SR 3006: SR 90 to SR 3003
Infrastructure
Bidding
$5,000,000 CJ est. value
Conneaut Township, PA 16401

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

Asbestos Abatement, Structure Demolition, and Site Restoration
Demolition, Infrastructure, Alteration
Post-Bid
Fairview, PA 16415

Bartlett Road Bridge No. 1 Replacement Project
Results
Harborcreek, PA

West Front Street Extension
Infrastructure
Results
Erie, PA 16507

SR 19: I-90 to Rotunda Dr
Infrastructure
Conception
$2,830,000 CJ est. value
Summit Township, PA 16441

Erie 2022 Bridge Shotcrete Group
Infrastructure, Renovation
Design
$380,000 CJ est. value
Erie, PA 16504

Fuel Storage and Dispensing Project
New Construction, Infrastructure
Bidding
$114,600 CJ est. value
Edinboro, PA 16412

Pavement and Concrete Replacement - District Wide
Infrastructure
Post-Bid
Erie, PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

Last Updated 03/15/2023 01:43 AM
Project Title

SR 8 Bridge/French Creek West Branch

Physical Address View project details and contacts
City, State (County) Erie, PA 16504   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 8 (Wattsburg Road) Main Street Bridge over French Creek West Branch in the Borough of Wattsburg. As of March 15, 2023, the project is in future development stage. Anticipated letting date is January 01, 2026. PennDOT - SR 8 Bridge/French Creek West Branch Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents