Similar Projects
Pedestrian Safety Improvement
Bidding
$454,757 est. value
FL

Live Oak Dr Sidewalk Improvements
Bidding
Jacksonville, FL 32246

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Lenox Avenue Sidewalk Improvments - JSEB Set Aside
Post-Bid
Jacksonville, FL 32202

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

ADA Curb Ramp Improvements - Southside Phase III - PQ-HORIZONTAL
Results
Less than $1,394,842 est. value
Jacksonville, FL 32202

Love Bridal Boutique
Renovation - 3,760 SF
Construction
$396,000 est. value
Jacksonville Beach, FL

Bike Lane/Sidewalk/Milling and Resurfacing
Bidding
$1,608,860 est. value
FL

Lowe's #2472 - Parking Lot Rehabilitation
Renovation
Post-Bid
Jacksonville, FL 32218

Gateway, Tillie Fowler, Yates Building and Blue Cypress ADA Improvements - Package D
Results
Less than $136,453 est. value
Jacksonville, FL 32202

Brentwood Park, Installation of ADA Compliant Concrete Path
Bidding
Jacksonville, FL 32206

Moncrief Transit Corridor Construction Engineering & Inspection
Post-Bid
$869,702 est. value
Jacksonville, FL 32099

Biscayne Boulevard Sidewalk from Biscayne CT to International Airport Boulevard-PQ-Horizontal
Results
Jacksonville, FL 32202

Bike Path/Trail/Drainage Improvements
Results
Less than $8,740,835 est. value
FL

Commonwealth Service Center Paving and Drainage Improvements
Results
Jacksonville, FL 32254

Last Updated 01/13/2020 01:44 PM
Project Title

San Pablo Right Turn Lane Project

Physical Address View project details and contacts
City, State (County) Jacksonville, FL   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $89,370
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all material, labor and equipment to performall all operations necessary for the reconstruction of a through lane and changed to a right turn lane for the southbound direction on San Pablo Road at W.M. Davis Parkway intersection. This includes raised concrete island removal, removal of existing striping, removal of existing pavement, and a new concrete island, added pavement epair, ADA accessible ramps, new pavement and lane striping, and signage.

Details

Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents