Similar Projects
2022 Well Redevelopment Project
Infrastructure
Bidding
$382,000 est. value
Lebanon, OH

Purchase of New and Rebuilt Motors and Pumps and Related Repairs
Infrastructure
Bidding
Cleveland, OH

Dpu/Iqa/Project Dry Basement
Post-Bid
Columbus, OH

Rough Vacuum Pumps for VF-6 and Building 301
Term Contract
Post-Bid
Cleveland, OH 44135

Greenfield Levee Pump/Motor #2 Repair
Results
Bainbridge, Greenfield, OH 45612

PUB Water Treatment Plant Well Rehabilitation Project
Results
$597,200 est. value
Batavia, OH 45103

Influent Screw Pump Installation
Infrastructure
Post-Bid
Chillicothe, OH

Vertiflo 720 Duplex Pump and Control System
Results
Less than $89,192 est. value
Dayton, OH

Bear Exhibit Redevelopment - Pump Station Installation
Infrastructure
Post-Bid
Toledo, OH 43609

PUB Well Field Control Tower (Wells 17-20)
Results
Less than $380,911 est. value
Batavia, OH 45103

Chilled Water Plant 3 Distribution Pump 2021
Infrastructure
Post-Bid
$280,000 est. value
Athens, OH 45701

Richards Well Field Expansion Project
Results
$1,600,000 est. value
Circleville, OH 43113

Bear Exhibit Redevelopment Project - Bid Package #2
Term Contract
Post-Bid
Toledo, OH 43609

2021 Well Redevelopment Project
Results
$320,000 est. value
OH

New Well 7
Infrastructure
Post-Bid
$240,000 est. value
Reedsville, OH

Reported 05/19/2022 12:00 AM
Project Title

Greenhouse Pumps

Physical Address View project details and contacts
City, State (County) Massillon, OH 44646   (Stark County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents