Last Updated 10/15/2020 10:51 AM
Project Title

DLA Distribution Susquehanna PA Wash Rack Sludge Removal

Physical Address View project details and contacts
City, State (County) New Cumberland, PA 17070   (Cumberland County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall remove and dispose of approximately 7,500 gallons of non-hazardous sludge solids (referred to as sludge throughout the remainder of this document) annually from the Defense Distribution Center, Susquehanna and Naval Support Activity Mechanicsburg. Contractor shall remove sludge four (4) times per year. Waste shall be removed from two pits located in the each bay of Defense Distribution Center, Susquehanna’s vehicle wash racks located in Building 749 (these two pits are approximately 3’ x 3’ x 3’). There are two additional pits at Defense Distribution Center, Susquehanna inside Building 2001 sweeper cleanout room (these two pits are approximately 3’ x 2’ x 3’). The contractor can access the Defense Distribution Center, Susquehanna pits by removing grates. There are two additional pits at Naval Support Activity Mechanicsburg which are approximately 4’ x 5’ x 4” and 4’ x 4’ x 4”. Contractor is responsible to ensure sludge removed from pits does not exceed the 7,500 gallons annual limitation. Contractor shall transport sludge to a DEP approved facility for final disposition. Price quote should reflect contractor cleaning all pits on Defense Distribution Center, Susquehanna and Naval Support Activity Mechanicsburg on the same day. However, if the gallon or truck hauling limit of the contract will be met and additional solid waste requires removal to maintain operation of the pits prior to the contract expiring, the contractor will remove and dispose of additional sludge from the pits at no increase in the unit cost. For unforeseen circumstances such as large quantities of oil or filamentous bacteria, the contractor will provide a separate quote for sludge removal and wait for approval to remove the sludge.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents