Similar Projects
Reported | 12/19/2018 12:00 AM |
Project Title | Construction of the 2017-2018 CDBG Downtown Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Lehi, UT (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer - 12/04/18 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work to be accomplished under this proposed contract includes: Installation of curb, gutter and sidewalks, ADA ramps, and drive approaches. Includes asphalt repair and new paving. Installation of 15" RCP storm drain with associated catch basins. Removal and replacement of existing 6" pressurized irrigation with new 8" DR-18 C900 PVC Purple with associated valves, fire hydrants, 1" service line reconnections. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |