Similar Projects
Pole Type Transformers and Single Phase/Three Phase Padmount Transformers
Term Contract
Bidding
Chattanooga, TN 37402

Lawn Care
Term Contract
Bidding

Blanket Contract for Parking Lot Seal Coating and Repairs
Post-Bid
Chattanooga, TN

The Swath Mowing and Litter Removal on I-24
Post-Bid
TN

USDA Forest Service Southern Region 8- Disaster Recovery
Results
$250,000 to $7,000,000 est. value

Installation of the South Seminole Drive and Boyd Street Stormwater Improvements
Results
East Ridge, TN 37412

Utility Service for East Ridge Splash Pad
Bidding
East Ridge, TN

Cutting, Removal and Disposal of Various Trees in Multiple Locations
Post-Bid
Signal Mountain, TN 37377

Locating and Marking Services for Underground Utilities
Results
Chattanooga, TN 37400

Irrigation Pump & Motor For Brainerd Golf Course
Bidding
Chattanooga, TN 37411

26th Street
Post-Bid
Chattanooga, TN

Shallowford Bonnie Way Sidewalk
Results
Less than $705,222 est. value
Chattanooga, TN

Concrete Sidewalk Grinding Services
Term Contract
Post-Bid
Chattanooga, TN 37402

Caine Lane Greenway
Results
Less than $712,713 est. value
Chattanooga, TN 37400

Camp Jordan Irrigation
Post-Bid
East Ridge, TN 213685

Last Updated 03/10/2021 01:47 PM
Project Title

Concrete Pathway Installation, Landscaping, Storm Water Structure Modifications, Irrigation System, L.E.D. Pedestrian Lighting, Installation of ADA Compliant Crossing Ramps, Railroad Safety Improvements

Physical Address View project details and contacts
City, State (County) Chattanooga, TN   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Electric, Landscaping/Irrigation, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of approximately 3800 linear feet of a concrete multi-modal path varying between 10 feet and 12 feet wide with a 5 foot grass strip separating pedestrians and cyclists from vehicular traffic. The project is located in St. Elmo and goes from Middle Street to the Incline Railway. The project will include but is not limited to, concrete pathway installation, landscaping, storm water structure modifications, irrigation system, L.E.D. pedestrian lighting, installation of ADA compliant crossing ramps, railroad safety improvements, and pavement markings. Additionally, St. Elmo Avenue will be resurfaced within the limits of the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents