Similar Projects
Neumann Developments West Ryan Road Subdivision
New Construction
Design
Franklin, WI 53132

Remodeling & Repairs of 2862-2864 South 35th Street
Bidding
Milwaukee, WI 53215

Remodeling and Repairs at 4514 North 38th Street
Renovation
Bidding
Milwaukee, WI 53209

2846 North Frederick Avenue Single Family Residence
Post-Bid
Milwaukee, WI 53211

Remodeling and Repairs at 4148 North 17th Street
Renovation
Post-Bid
Milwaukee, WI 53209

General Contracting - Housing Infrastructure
Renovation
Results
Milwaukee, WI 53208

General Contracting at 4444 North 26th Street
Renovation
Results
Milwaukee, WI 53209

Lakeshore Commons Multi-Family & Townhomes
New Construction
Construction
Oak Creek, WI 53154

Oak Creek Residential Development
New Construction - 19,968 SF
Pending Verification
$10,000,000 CJ est. value
Oak Creek, WI 53154

Remodeling and Repairs at 4044 North 19th Street
Renovation
Bidding
Milwaukee, WI 53209

Roessgers Property Remodeling
Renovation, Addition
Post-Bid
Milwaukee, WI 53204

Building 3.1 Bid Package 2001-2007
Renovation
Results
Milwaukee, WI

Remodeling and Repairs at 8603 West Potomac Avenue
Renovation
Bidding
Milwaukee, WI 53225

Remodeling and Repairs at 6065 North 35th Street
Renovation
Post-Bid
Milwaukee, WI 53209

5062 N 85Th St - General
Renovation
Bidding
Milwaukee, WI 53225

Reported 03/02/2022 12:00 AM
Project Title

Remodeling and Repairs at 10818-10820 West Cameron Avenue

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53225   (Milwaukee County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1 Roof Replacement: Tear off all layers of existing shingles and replace the entire roof. Provide ice and water shield a minimum of 3 feet wide at all roof edges, and valleys, install synthetic roofing felts, and metal drip and apron flashing. Install new roof vents per code. Provide all necessary flashings, and minimum 30 year dimensional shingles 2 Roof Replacement OSB Sheathing: As part of the roof replacement work in work item #1, install 7/16" OSB sheathing over the entire deck. (Field verify that the existing roof has gaps between the deck boards. If it does not, this work item will be deleted. 3 Chimney Repairs: Re-flash the chimney with metal flashing color matched to the roof. 4 Siding Repairs: Re-secure the loose siding pieces and replace one missing section, with color-matched siding. Seal all joints with color matched sealant 5 Door Replacement: Replace the existing side entry (East) door with a metal clad exterior door with a high upper-lite. Install a thumb-turn deadbolt and locking handle, keyed alike. Paint all exposed wood trim work; jambs and brick molding, etc 6 Alarms: Install a combination smoke/CO alarm in the basement, first floor, second floor. All alarms shall be sealed battery, 10 year lithiumion units. 7 Furnace Repairs: A.) Re-seal the penetrations through into the return ductwork B.) Replace the condensate drip tube with a longer tube so that it reaches into the condensate drain pump. 8 Leaky Plumbing Pipes: Replace the leaky and deteriorated galvanized water pipes and valves near the water heaters, and one galvanized "T" near the first floor bathtub drain. For all repairs: copper piping and galvanized piping must be separated by a dielectric union 9 Faucet Repair: Secure the loose kitchen faucet. (The fastening nuts have become loose.) 10 Water Supply Valve Leak: The cold water supply valve under the kitchen sink is leaky. Correct or replace it to resolve the leak issue 11 Electrical Repairs: A.) Install cover plates at all outlets and switches which are missing plates. B.) Install a box extension and cover plate at the bathroom switch gang-box so that the box is not set excessively back from the face of the wall. C.) Properly terminate the existing wire conduit under the kitchen sink (from a former garbage disposal) in a metal junction box with a solid cover. 12 Stairway Door: Replace the broken door into the upper unit with a 20 minute fire-rated solid core door. The door shall be finished, either stained/varnished or painted, per owner. Install a locking door handle and deadbolt, keyed alike. 13 Electrical Outlet/Circuit Repairs: The owner reports that the outlets in the living room are non-functional. Locate and correct any wiring or receptacle issues to restore functionality of all receptacles.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents